A platform for research: civil engineering, architecture and urbanism
Steel strand traction fixing device for sling tower and using method of steel strand traction fixing device
The invention relates to a steel strand traction fixing device for a sling tower and a using method of the steel strand traction fixing device. A winch assembly is installed on the tower top of the sling tower, a traction steel strand is connected with the winch assembly and a second connecting cylinder, and then the end of the traction steel strand penetrates through an anchorage device steel strand bundle penetrating hole and is lowered to the target position of the tower bottom; the connecting end of the pulled steel strand is arranged at a target position, and a first connecting cylinder is installed; then the first connecting cylinder and the second connecting cylinder are connected through the connecting piece; the winch assembly is started, the dragged steel strand is dragged to the top of the sling tower, the dragged steel strand and the dragging steel strand are detachably connected through the devices and the construction steps, and the dragged steel strand and the dragging steel strand can pass through the strand penetrating hole. Under the action of the winch, the dragged steel strand quickly and accurately passes through the anchor plate under the traction of the traction steel strand, and is not influenced by high-altitude wind power; and the installation efficiency of the pulled steel strand is improved, the influence of the hoisting height or operation space of a self-propelled crane is avoided, and construction is facilitated.
本申请涉及一种吊索塔架用钢绞线牵引固定装置及其使用方法,卷扬组件安装在吊索塔架的塔顶上,牵引钢绞线连接卷扬组件和第二连接筒,然后该端穿过锚具钢绞线穿束孔,并下放至塔底的目标位置;将被牵引钢绞线的连接端设置在目标位置,并安装第一连接筒;然后利用连接件将第一连接筒和第二连接筒连接;启动卷扬组件,将被牵引钢绞线牵引至吊索塔架顶部,以上装置和施工步骤使得被牵引钢绞线和牵引钢绞线之间可拆卸连接,被牵引钢绞线和牵引钢绞线可从穿束孔通过,在卷扬机的作用下被牵引钢绞线在牵引钢绞线的牵引下快速准确通过锚板,不受高空风力影响;提高了被牵引钢绞线的安装效率,不受自行式起重机起吊高度或作业空间的影响,便于施工。
Steel strand traction fixing device for sling tower and using method of steel strand traction fixing device
The invention relates to a steel strand traction fixing device for a sling tower and a using method of the steel strand traction fixing device. A winch assembly is installed on the tower top of the sling tower, a traction steel strand is connected with the winch assembly and a second connecting cylinder, and then the end of the traction steel strand penetrates through an anchorage device steel strand bundle penetrating hole and is lowered to the target position of the tower bottom; the connecting end of the pulled steel strand is arranged at a target position, and a first connecting cylinder is installed; then the first connecting cylinder and the second connecting cylinder are connected through the connecting piece; the winch assembly is started, the dragged steel strand is dragged to the top of the sling tower, the dragged steel strand and the dragging steel strand are detachably connected through the devices and the construction steps, and the dragged steel strand and the dragging steel strand can pass through the strand penetrating hole. Under the action of the winch, the dragged steel strand quickly and accurately passes through the anchor plate under the traction of the traction steel strand, and is not influenced by high-altitude wind power; and the installation efficiency of the pulled steel strand is improved, the influence of the hoisting height or operation space of a self-propelled crane is avoided, and construction is facilitated.
本申请涉及一种吊索塔架用钢绞线牵引固定装置及其使用方法,卷扬组件安装在吊索塔架的塔顶上,牵引钢绞线连接卷扬组件和第二连接筒,然后该端穿过锚具钢绞线穿束孔,并下放至塔底的目标位置;将被牵引钢绞线的连接端设置在目标位置,并安装第一连接筒;然后利用连接件将第一连接筒和第二连接筒连接;启动卷扬组件,将被牵引钢绞线牵引至吊索塔架顶部,以上装置和施工步骤使得被牵引钢绞线和牵引钢绞线之间可拆卸连接,被牵引钢绞线和牵引钢绞线可从穿束孔通过,在卷扬机的作用下被牵引钢绞线在牵引钢绞线的牵引下快速准确通过锚板,不受高空风力影响;提高了被牵引钢绞线的安装效率,不受自行式起重机起吊高度或作业空间的影响,便于施工。
Steel strand traction fixing device for sling tower and using method of steel strand traction fixing device
一种吊索塔架用钢绞线牵引固定装置及其使用方法
WEN JIE (author) / YI WEIPING (author) / TUO SHOUJIAN (author) / WANG YALONG (author) / SHEN GUOJUN (author) / CAO MINGMING (author) / DONG WENKE (author) / YU KUN (author) / YI JUNFENG (author) / YANG YINGZHOU (author)
2024-10-29
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Buckle cable steel strand traction system and steel strand installation method
European Patent Office | 2024
|European Patent Office | 2024
|