A platform for research: civil engineering, architecture and urbanism
Guiding device and method for secondary follow-up of pile casing
The invention discloses a guiding device for secondary follow-up of a pile casing, and relates to the technical field of long and large bridge construction. The guiding device comprises a horizontal limiting frame, a vertical supporting frame is erected at the center of the horizontal limiting frame and is perpendicular to the horizontal limiting frame, and the horizontal limiting frame comprises a plurality of horizontal limiting frames which are sequentially arranged side by side; the horizontal limiting frame is used for guiding secondary follow-up of the pile casing, and the horizontal limiting frame is provided with a plurality of detachable guiding devices around a pile casing body. The invention further discloses a method of the guiding device, the guiding device and the guiding method for secondary follow-up of the pile casing can meet the actual function requirement of perpendicularity control of secondary follow-up of the pile casing, and the construction efficiency of secondary follow-up of the pile casing is greatly improved.
本发明公开了一种用于护筒二次跟进的导向装置,设计长大桥梁施工技术领域,包括水平限位框架,水平限位框架中心处架设有竖向支撑框架,且竖向支撑框架与水平限位框架垂直,水平限位框架包括并排依次设置的多个水平限位框,水平限位框用于护筒二次跟进的导向,水平限位框绕护筒桶身设有多个可拆卸式导向设备;本发明还公开了该装置的方法,本发明提供的一种用于护筒二次跟进的导向装置及导向方法,能够满足护筒二次跟进垂直度控制的实际功能需求,大幅提高护筒二次跟进施工效率。
Guiding device and method for secondary follow-up of pile casing
The invention discloses a guiding device for secondary follow-up of a pile casing, and relates to the technical field of long and large bridge construction. The guiding device comprises a horizontal limiting frame, a vertical supporting frame is erected at the center of the horizontal limiting frame and is perpendicular to the horizontal limiting frame, and the horizontal limiting frame comprises a plurality of horizontal limiting frames which are sequentially arranged side by side; the horizontal limiting frame is used for guiding secondary follow-up of the pile casing, and the horizontal limiting frame is provided with a plurality of detachable guiding devices around a pile casing body. The invention further discloses a method of the guiding device, the guiding device and the guiding method for secondary follow-up of the pile casing can meet the actual function requirement of perpendicularity control of secondary follow-up of the pile casing, and the construction efficiency of secondary follow-up of the pile casing is greatly improved.
本发明公开了一种用于护筒二次跟进的导向装置,设计长大桥梁施工技术领域,包括水平限位框架,水平限位框架中心处架设有竖向支撑框架,且竖向支撑框架与水平限位框架垂直,水平限位框架包括并排依次设置的多个水平限位框,水平限位框用于护筒二次跟进的导向,水平限位框绕护筒桶身设有多个可拆卸式导向设备;本发明还公开了该装置的方法,本发明提供的一种用于护筒二次跟进的导向装置及导向方法,能够满足护筒二次跟进垂直度控制的实际功能需求,大幅提高护筒二次跟进施工效率。
Guiding device and method for secondary follow-up of pile casing
一种用于护筒二次跟进的导向装置、方法
CHEN YANSONG (author) / JI YINGJUN (author) / SHI WEIMIN (author) / WANG CHAO (author) / ZHANG YOUYI (author) / GUO YUQIANG (author) / XU MENG (author) / WANG MENGQI (author) / XU XIANMING (author) / ZHANG ZONGHU (author)
2024-11-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Karst goaf steel casing follow-up positioning and guiding device
European Patent Office | 2022
|Pile casing mounting device and pile casing mounting method
European Patent Office | 2023
|Guiding device for accurately burying pile foundation casing on water floating platform
European Patent Office | 2024
|