A platform for research: civil engineering, architecture and urbanism
The invention relates to building construction, in particular to a dry-type connecting method for upper and lower prefabricated walls. Comprising the following steps that S1, when the prefabricated wall bodies are produced, hand holes are formed in the side wall surfaces of the connecting ends of every two adjacent prefabricated wall bodies, and bolt holes are formed in the top surfaces and the bottom surfaces of the hand holes of the two prefabricated wall bodies; s2, the prefabricated wall body is transported to a construction site; s3, mounting a lower-layer prefabricated wall body; s4, the upper-layer prefabricated wall body is arranged on the lower-layer prefabricated wall body; s5, bolts are installed in the bolt holes of the lower-layer prefabricated wall body and the upper-layer prefabricated wall body; and S6, the steps S4-S5 are repeated, and the upper-layer prefabricated wall bodies are sequentially installed. The bolt holes are reserved in the side wall surfaces of the two adjacent prefabricated wall bodies in advance, the two prefabricated wall bodies are fixedly installed through bolt connection during on-site installation, the wall body installation speed is greatly increased, meanwhile, the installation accuracy is improved, and therefore the construction efficiency is improved.
本发明涉及建筑施工,特别是一种上下层预制墙体干式连接方法。包括如下步骤:S1、预制墙体生产时,在相邻两个预制墙体的连接端的侧墙面开设手孔,两个预制墙体的手孔的顶面和底面开设有螺栓孔;S2、预制墙体运输至施工现场;S3、下层预制墙体安装;S4、上层预制墙体置于下层预制墙体上;S5、下层预制墙体和上层预制墙体的螺栓孔内安装螺栓;S6、重复步骤S4‑S5,依次安装上层预制墙体。本发明的两个相邻的预制墙体的侧墙面提前预留螺栓孔,在现场安装的时候利用螺栓连接将两个预制墙体进行固定安装,不仅大幅度的提高了墙体安装速度,同时也提高了安装的精准度,从而提高了施工效率。
The invention relates to building construction, in particular to a dry-type connecting method for upper and lower prefabricated walls. Comprising the following steps that S1, when the prefabricated wall bodies are produced, hand holes are formed in the side wall surfaces of the connecting ends of every two adjacent prefabricated wall bodies, and bolt holes are formed in the top surfaces and the bottom surfaces of the hand holes of the two prefabricated wall bodies; s2, the prefabricated wall body is transported to a construction site; s3, mounting a lower-layer prefabricated wall body; s4, the upper-layer prefabricated wall body is arranged on the lower-layer prefabricated wall body; s5, bolts are installed in the bolt holes of the lower-layer prefabricated wall body and the upper-layer prefabricated wall body; and S6, the steps S4-S5 are repeated, and the upper-layer prefabricated wall bodies are sequentially installed. The bolt holes are reserved in the side wall surfaces of the two adjacent prefabricated wall bodies in advance, the two prefabricated wall bodies are fixedly installed through bolt connection during on-site installation, the wall body installation speed is greatly increased, meanwhile, the installation accuracy is improved, and therefore the construction efficiency is improved.
本发明涉及建筑施工,特别是一种上下层预制墙体干式连接方法。包括如下步骤:S1、预制墙体生产时,在相邻两个预制墙体的连接端的侧墙面开设手孔,两个预制墙体的手孔的顶面和底面开设有螺栓孔;S2、预制墙体运输至施工现场;S3、下层预制墙体安装;S4、上层预制墙体置于下层预制墙体上;S5、下层预制墙体和上层预制墙体的螺栓孔内安装螺栓;S6、重复步骤S4‑S5,依次安装上层预制墙体。本发明的两个相邻的预制墙体的侧墙面提前预留螺栓孔,在现场安装的时候利用螺栓连接将两个预制墙体进行固定安装,不仅大幅度的提高了墙体安装速度,同时也提高了安装的精准度,从而提高了施工效率。
Dry-type connecting method for upper-layer prefabricated wall and lower-layer prefabricated wall
上下层预制墙体干式连接方法
2024-11-05
Patent
Electronic Resource
Chinese
Prefabricated wall, upper wall and lower wall connecting structure and wall mold
European Patent Office | 2020
|Dry-type connecting structure of prefabricated wall and dry-type connecting prefabricated wall
European Patent Office | 2021
|Prefabricated wall, mold, and connecting structure and method of upper and lower layer walls
European Patent Office | 2021
|Prefabricated wall, mold, and connecting structure and method of upper and lower layer walls
European Patent Office | 2020
|