A platform for research: civil engineering, architecture and urbanism
Construction method for mixed type test pavement of test site
The invention discloses a construction method for a mixed type test pavement in a test site. The construction method comprises the following steps: (1) surveying and setting out; (2) arranging a reinforcing mesh; (3) reserving a manhole position; (4) distribution of dowel bars; (5) pouring concrete; (6) concrete surface finishing; (7) curing the concrete pavement; (8) mounting a well lid and building a manhole; and (9) rechecking the elevation. The three-dimensional control technology is applied, the problems that a mixed type test pavement composed of a cast iron component, a high-strength concrete pavement and a manhole stone block is complex in construction process and high in connection difficulty of pavements made of different materials are solved, the problem that the pavements made of different materials cannot be connected due to different elevations is solved, the construction process is optimized, and the construction efficiency is improved. The difficulty of construction operation is reduced, the construction precision is greatly improved, and the construction quality is ensured.
本发明公开了一种试验场混合型测试路面施工方法,包括以下步骤:(1)测量放样;(2)钢筋网布设;(3)人孔位置预留;(4)传力杆布设;(5)混凝土浇筑;(6)混凝土收面;(7)混凝土路面养生;(8)井盖安装及人孔砌筑;(9)高程复核。本发明应用了三维控制技术,解决了铸铁构件、高强度混凝土路面及人孔石块组成的混合型测试路面施工工艺复杂,不同种材料路面衔接难度高的问题,以及不同材质的路面由于高程不同无法衔接的难题,优化了施工工艺,降低了施工作业的难度,大大提高了施工精度,确保施工质量。
Construction method for mixed type test pavement of test site
The invention discloses a construction method for a mixed type test pavement in a test site. The construction method comprises the following steps: (1) surveying and setting out; (2) arranging a reinforcing mesh; (3) reserving a manhole position; (4) distribution of dowel bars; (5) pouring concrete; (6) concrete surface finishing; (7) curing the concrete pavement; (8) mounting a well lid and building a manhole; and (9) rechecking the elevation. The three-dimensional control technology is applied, the problems that a mixed type test pavement composed of a cast iron component, a high-strength concrete pavement and a manhole stone block is complex in construction process and high in connection difficulty of pavements made of different materials are solved, the problem that the pavements made of different materials cannot be connected due to different elevations is solved, the construction process is optimized, and the construction efficiency is improved. The difficulty of construction operation is reduced, the construction precision is greatly improved, and the construction quality is ensured.
本发明公开了一种试验场混合型测试路面施工方法,包括以下步骤:(1)测量放样;(2)钢筋网布设;(3)人孔位置预留;(4)传力杆布设;(5)混凝土浇筑;(6)混凝土收面;(7)混凝土路面养生;(8)井盖安装及人孔砌筑;(9)高程复核。本发明应用了三维控制技术,解决了铸铁构件、高强度混凝土路面及人孔石块组成的混合型测试路面施工工艺复杂,不同种材料路面衔接难度高的问题,以及不同材质的路面由于高程不同无法衔接的难题,优化了施工工艺,降低了施工作业的难度,大大提高了施工精度,确保施工质量。
Construction method for mixed type test pavement of test site
一种试验场混合型测试路面施工方法
DOU WENJU (author) / SHEN JINTIAN (author) / LIU XIYOU (author) / ZHAO CHUNHUA (author) / XU BINCHAO (author) / TANG ZHILI (author) / LUO LIANG (author) / LU WEI (author) / ZENG XIANLONG (author) / ZHAO LIANG (author)
2024-11-08
Patent
Electronic Resource
Chinese
Construction method of test pavement for large aircraft test
European Patent Office | 2023
|Radisson specific pavement studies - 9A test site
British Library Conference Proceedings | 1999
|Construction method of irregular waveform pavement of test field
European Patent Office | 2020
|Construction method of asphalt replaceable pavement for large aircraft test
European Patent Office | 2023
|Construction method of concrete replaceable pavement for large aircraft test
European Patent Office | 2023
|