A platform for research: civil engineering, architecture and urbanism
Construction method for historic building roof maintenance
The invention relates to a construction method for historic building roof maintenance, and belongs to the technical field of historic building repair. Comprising the following steps that spraying inspection is conducted on a roof, and the roof leakage position is positioned; uncovering the cylindrical tile and the tile at the leakage position of the roof; the uncovered semi-cylindrical tiles and tiles are placed on a positioning mechanism on a roof, and the positioning mechanism is transferred through a displacement mechanism so that the semi-cylindrical tiles and the tiles can be repaired or replaced conveniently; and the semi-cylindrical tiles and the tiles at the positioning mechanism are transferred to the to-be-repaired position of the roof through the displacement mechanism, the tiles and the semi-cylindrical tiles are laid again, and maintenance of the historic building roof is completed. According to the construction method, the safety of repairing the roof of the historic building can be improved, and meanwhile, tiles or cylindrical tiles on the roof of the historic building are effectively protected.
本申请涉及一种古建筑屋面检修的施工方法,属于古建筑修复的技术领域。包括以下步骤:对屋面进行喷淋检查,定位屋面渗漏位置;揭开屋面渗漏位置处的筒瓦与瓦片;将揭开的筒瓦与瓦片置于屋面上的定位机构处,并通过位移机构对定位机构转移,以便于对筒瓦与瓦片的修复或更换;通过位移机构将定位机构处的筒瓦与瓦片转移至屋面待修复处,重新铺设瓦片与筒瓦,完成对古建筑屋面的检修。本申请能够提升在对古建筑屋面进行修复作业时的安全性,同时对古建筑屋面的瓦片或筒瓦进行有效地保护。
Construction method for historic building roof maintenance
The invention relates to a construction method for historic building roof maintenance, and belongs to the technical field of historic building repair. Comprising the following steps that spraying inspection is conducted on a roof, and the roof leakage position is positioned; uncovering the cylindrical tile and the tile at the leakage position of the roof; the uncovered semi-cylindrical tiles and tiles are placed on a positioning mechanism on a roof, and the positioning mechanism is transferred through a displacement mechanism so that the semi-cylindrical tiles and the tiles can be repaired or replaced conveniently; and the semi-cylindrical tiles and the tiles at the positioning mechanism are transferred to the to-be-repaired position of the roof through the displacement mechanism, the tiles and the semi-cylindrical tiles are laid again, and maintenance of the historic building roof is completed. According to the construction method, the safety of repairing the roof of the historic building can be improved, and meanwhile, tiles or cylindrical tiles on the roof of the historic building are effectively protected.
本申请涉及一种古建筑屋面检修的施工方法,属于古建筑修复的技术领域。包括以下步骤:对屋面进行喷淋检查,定位屋面渗漏位置;揭开屋面渗漏位置处的筒瓦与瓦片;将揭开的筒瓦与瓦片置于屋面上的定位机构处,并通过位移机构对定位机构转移,以便于对筒瓦与瓦片的修复或更换;通过位移机构将定位机构处的筒瓦与瓦片转移至屋面待修复处,重新铺设瓦片与筒瓦,完成对古建筑屋面的检修。本申请能够提升在对古建筑屋面进行修复作业时的安全性,同时对古建筑屋面的瓦片或筒瓦进行有效地保护。
Construction method for historic building roof maintenance
一种古建筑屋面检修的施工方法
XIAN SHIMING (author) / LING SHENG (author) / CHEN GUOLING (author) / PANG ZHIHONG (author)
2024-11-08
Patent
Electronic Resource
Chinese
Civil building construction roof cracking maintenance device
European Patent Office | 2023
|Historic roof structures: life-cycle assessment and selective maintenance strategies
BASE | 2018
|