A platform for research: civil engineering, architecture and urbanism
Gate overhauling equipment and method for water conservancy dam
The invention discloses gate overhauling equipment and method for a water conservancy dam, and belongs to the technical field of water conservancy dams. Comprising a gate and a gate groove, and a water fence frame is detachably connected to the inner side of the gate groove. The inner side of the gate groove is connected with a moving device, and the lower side of the moving device is fixedly connected with a maintenance device. The lower portion of the moving device is fixedly connected with the storage box, and the first electric cylinder is fixedly connected with the inner side wall of the storage box. An output shaft of the first electric cylinder is fixedly connected with the push plate, the push plate is slidably connected with the storage box, and the extension opening obliquely communicates with the side face of the storage box. The discharge port communicates with the lower side of the extension port, and the stop block is located in the extension port and slidably connected with the extension port. One end of the abutting rod penetrates through the extending opening and is fixedly connected with the check block, the other end of the abutting rod is fixedly connected with the arc-shaped plate, and the abutting rod penetrates through the first spring. The first spring is located between the extending opening and the arc-shaped plate. The controller is fixedly connected with the side face of the outlet. The problems that concrete on the two sides of a gate groove in an existing device falls off and is damaged are solved.
本发明公开了一种水利大坝用闸门检修设备及方法,属于水利大坝技术领域。包括闸门以及闸槽,闸槽内侧拆卸连接有栏水框。闸槽内侧还连接有移动装置,移动装置下侧面固定连接有检修装置。移动装置下部与存储箱固定连接,第一电缸与存储箱内侧壁固定连接。第一电缸输出轴与推板固定连接,推板与存储箱滑动连接,延伸口呈斜向与存储箱侧面连通。排出口与延伸口下侧连通,挡块位于延伸口内并与延伸口滑动连接。抵触杆一端穿设过延伸口并与挡块固定连接,抵触杆另一端与弧形板固定连接,抵触杆穿设过第一弹簧。第一弹簧位于延伸口与弧形板之间。控制器与排出口侧面固定连接。以解决现有装置中闸槽两侧的混凝士脱落、破损的问题。
Gate overhauling equipment and method for water conservancy dam
The invention discloses gate overhauling equipment and method for a water conservancy dam, and belongs to the technical field of water conservancy dams. Comprising a gate and a gate groove, and a water fence frame is detachably connected to the inner side of the gate groove. The inner side of the gate groove is connected with a moving device, and the lower side of the moving device is fixedly connected with a maintenance device. The lower portion of the moving device is fixedly connected with the storage box, and the first electric cylinder is fixedly connected with the inner side wall of the storage box. An output shaft of the first electric cylinder is fixedly connected with the push plate, the push plate is slidably connected with the storage box, and the extension opening obliquely communicates with the side face of the storage box. The discharge port communicates with the lower side of the extension port, and the stop block is located in the extension port and slidably connected with the extension port. One end of the abutting rod penetrates through the extending opening and is fixedly connected with the check block, the other end of the abutting rod is fixedly connected with the arc-shaped plate, and the abutting rod penetrates through the first spring. The first spring is located between the extending opening and the arc-shaped plate. The controller is fixedly connected with the side face of the outlet. The problems that concrete on the two sides of a gate groove in an existing device falls off and is damaged are solved.
本发明公开了一种水利大坝用闸门检修设备及方法,属于水利大坝技术领域。包括闸门以及闸槽,闸槽内侧拆卸连接有栏水框。闸槽内侧还连接有移动装置,移动装置下侧面固定连接有检修装置。移动装置下部与存储箱固定连接,第一电缸与存储箱内侧壁固定连接。第一电缸输出轴与推板固定连接,推板与存储箱滑动连接,延伸口呈斜向与存储箱侧面连通。排出口与延伸口下侧连通,挡块位于延伸口内并与延伸口滑动连接。抵触杆一端穿设过延伸口并与挡块固定连接,抵触杆另一端与弧形板固定连接,抵触杆穿设过第一弹簧。第一弹簧位于延伸口与弧形板之间。控制器与排出口侧面固定连接。以解决现有装置中闸槽两侧的混凝士脱落、破损的问题。
Gate overhauling equipment and method for water conservancy dam
一种水利大坝用闸门检修设备及方法
CHEN ZELIAN (author) / LU BINGYAN (author) / ZHU DONGYANG (author) / PI YE (author) / RUAN HUASHENG (author)
2024-11-12
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Overhauling crawling ladder for water conservancy project
European Patent Office | 2021
|