A platform for research: civil engineering, architecture and urbanism
Concrete pouring construction device and method for steel-concrete combined stiff column
The invention discloses a steel-concrete combined stiff column concrete pouring construction device and method.The steel-concrete combined stiff column concrete pouring construction device comprises a base, a supporting column, a supporting rod and a clamping frame, the supporting column is fixedly arranged on the base, the rotatable supporting rod is arranged at the upper end of the supporting column, the clamping frame is fixedly installed at the end of the supporting rod, a plurality of transverse grooves are formed in the bottom of the base, and transverse frames are arranged in the transverse grooves; a plurality of longitudinal grooves are further formed in the bottom of the base, adjusting frames are arranged in the longitudinal grooves, longitudinal frames are arranged in the adjusting frames, a plurality of second walking wheels are arranged in the longitudinal frames, flow guide ring grooves are formed in the outer sides of the first walking wheels and the outer sides of the second walking wheels, and a plurality of evenly-distributed limiting grooves are further formed in the outer sides of the first walking wheels and the outer sides of the second walking wheels. The limiting groove transversely penetrates through the flow guide ring groove, the base is movable and matched with rotation of the clamping frame and the supporting rod, automatic control over the position of the output end of the concrete pumping pipe during pouring can be achieved, manual work can be replaced, the number of workers during concrete pouring is reduced, and cost is reduced.
本发明公开了一种钢混组合劲性柱混凝土浇筑施工装置及方法,包括底座、支撑柱、支撑杆和卡框,支撑柱固定设置在底座上,且支撑柱上端设有可转动的支撑杆,卡框固定安装在支撑杆端部,底座底部设有多个横槽,横槽内设有横框,横框内设有多个第一行走轮,底座底部还设有多个纵槽,纵槽内设有调节框,调节框内设有纵框,纵框内设有多个第二行走轮,第一行走轮和第二行走轮外侧均设有导流环槽,且第一行走轮和第二行走轮外侧还设有多个均匀分布的限位槽,限位槽横穿导流环槽,底座的可移动,配合卡框和支撑杆的旋转,就能够实现了浇筑使对混凝土泵送管输出端位置的自动化控制,从而能够代替人工,减少了混凝土浇筑时的人工数量,降低成本。
Concrete pouring construction device and method for steel-concrete combined stiff column
The invention discloses a steel-concrete combined stiff column concrete pouring construction device and method.The steel-concrete combined stiff column concrete pouring construction device comprises a base, a supporting column, a supporting rod and a clamping frame, the supporting column is fixedly arranged on the base, the rotatable supporting rod is arranged at the upper end of the supporting column, the clamping frame is fixedly installed at the end of the supporting rod, a plurality of transverse grooves are formed in the bottom of the base, and transverse frames are arranged in the transverse grooves; a plurality of longitudinal grooves are further formed in the bottom of the base, adjusting frames are arranged in the longitudinal grooves, longitudinal frames are arranged in the adjusting frames, a plurality of second walking wheels are arranged in the longitudinal frames, flow guide ring grooves are formed in the outer sides of the first walking wheels and the outer sides of the second walking wheels, and a plurality of evenly-distributed limiting grooves are further formed in the outer sides of the first walking wheels and the outer sides of the second walking wheels. The limiting groove transversely penetrates through the flow guide ring groove, the base is movable and matched with rotation of the clamping frame and the supporting rod, automatic control over the position of the output end of the concrete pumping pipe during pouring can be achieved, manual work can be replaced, the number of workers during concrete pouring is reduced, and cost is reduced.
本发明公开了一种钢混组合劲性柱混凝土浇筑施工装置及方法,包括底座、支撑柱、支撑杆和卡框,支撑柱固定设置在底座上,且支撑柱上端设有可转动的支撑杆,卡框固定安装在支撑杆端部,底座底部设有多个横槽,横槽内设有横框,横框内设有多个第一行走轮,底座底部还设有多个纵槽,纵槽内设有调节框,调节框内设有纵框,纵框内设有多个第二行走轮,第一行走轮和第二行走轮外侧均设有导流环槽,且第一行走轮和第二行走轮外侧还设有多个均匀分布的限位槽,限位槽横穿导流环槽,底座的可移动,配合卡框和支撑杆的旋转,就能够实现了浇筑使对混凝土泵送管输出端位置的自动化控制,从而能够代替人工,减少了混凝土浇筑时的人工数量,降低成本。
Concrete pouring construction device and method for steel-concrete combined stiff column
一种钢混组合劲性柱混凝土浇筑施工装置及方法
WANG SHENGTAO (author) / SHI HUAIYUAN (author) / LI CHAOJUN (author) / YANG QING (author) / ZHANG LIN (author) / CHEN HU (author)
2024-11-12
Patent
Electronic Resource
Chinese
Steel reinforced concrete column-beam joint concrete pouring construction method
European Patent Office | 2021
|Concrete filled steel tubular column pouring construction method
European Patent Office | 2024
|Concrete pouring construction method in steel pipe column
European Patent Office | 2021
|