A platform for research: civil engineering, architecture and urbanism
High-pier large-span bent cap attached support device and construction method thereof
The invention relates to a high-pier large-span bent cap attached type support device and a construction method thereof, and belongs to the technical field of bridge construction, the high-pier large-span bent cap attached type support device comprises two support bodies, the two support bodies are arranged in the space between two adjacent stand columns in three stand columns of a three-column portal pier respectively, and each support body comprises four measuring devices; the four measuring devices are arranged at the two ends of the two support bodies respectively. The device further comprises an auxiliary measuring device, the auxiliary measuring device is electrically connected with a control module, the four measuring devices are used for sending signals to the auxiliary measuring device, the auxiliary measuring device is used for receiving the signals sent by the four measuring devices, and the auxiliary measuring device is used for judging whether the four measuring devices and the auxiliary measuring device are located on the plane or not and sending the judgment result to the control module. The levelness is high, and the cover beam supporting effect is good.
本发明涉及一种高墩大跨度盖梁附着式支架装置及其施工方法,属于桥梁施工技术领域,包括两支架本体,两所述支架本体分别设置于三柱门架墩的三个立柱中两个相邻立柱之间的空间,所述支架本体包括四个测量器,四所述测量器分别设置于两支架本体的两端;还包括辅助测量器,所述辅助测量器电连接有控制模块,四所述测量器用于向辅助测量器发出信号,所述辅助测量器用于接受四测量器发出的信号,所述辅助测量其用于判断四测量器与自身是否处于平面,并将判断结果发送至控制模块;其水平度高,对盖梁支撑效果好。
High-pier large-span bent cap attached support device and construction method thereof
The invention relates to a high-pier large-span bent cap attached type support device and a construction method thereof, and belongs to the technical field of bridge construction, the high-pier large-span bent cap attached type support device comprises two support bodies, the two support bodies are arranged in the space between two adjacent stand columns in three stand columns of a three-column portal pier respectively, and each support body comprises four measuring devices; the four measuring devices are arranged at the two ends of the two support bodies respectively. The device further comprises an auxiliary measuring device, the auxiliary measuring device is electrically connected with a control module, the four measuring devices are used for sending signals to the auxiliary measuring device, the auxiliary measuring device is used for receiving the signals sent by the four measuring devices, and the auxiliary measuring device is used for judging whether the four measuring devices and the auxiliary measuring device are located on the plane or not and sending the judgment result to the control module. The levelness is high, and the cover beam supporting effect is good.
本发明涉及一种高墩大跨度盖梁附着式支架装置及其施工方法,属于桥梁施工技术领域,包括两支架本体,两所述支架本体分别设置于三柱门架墩的三个立柱中两个相邻立柱之间的空间,所述支架本体包括四个测量器,四所述测量器分别设置于两支架本体的两端;还包括辅助测量器,所述辅助测量器电连接有控制模块,四所述测量器用于向辅助测量器发出信号,所述辅助测量器用于接受四测量器发出的信号,所述辅助测量其用于判断四测量器与自身是否处于平面,并将判断结果发送至控制模块;其水平度高,对盖梁支撑效果好。
High-pier large-span bent cap attached support device and construction method thereof
一种高墩大跨度盖梁附着式支架装置及其施工方法
FANG ZHIQUN (author) / WAN MAOQING (author) / LI SHENGXI (author) / YANG XUEFENG (author) / HE PENG (author) / ZHENG JIE (author) / LIU XINYUN (author) / LIAO YUEKANG (author) / HUANG QING (author) / ZHOU QING (author)
2024-11-15
Patent
Electronic Resource
Chinese
High-pier large-cantilever bent cap support and construction method
European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2023
|Cast-in-place construction method for large-span diamond-shaped bent cap of high pier
European Patent Office | 2021
|