A platform for research: civil engineering, architecture and urbanism
Construction method of cement stabilized macadam layer
The invention discloses a construction method of a cement stabilized macadam layer. The construction method comprises the following steps: (1) preparation of a construction site; (2) connecting pieces between cement stabilized macadam layers are arranged; (3) laying a cement stabilized macadam bottom layer and a cement stabilized macadam middle layer; (4) laying a cement stabilized macadam top layer; (5) the inner shells in all the connecting pieces are pulled up and dismantled, then concrete is poured into the connecting pieces, and the interiors, including the multiple through holes, of the connecting pieces are fully poured; and (6) curing. Construction is convenient, the construction cost is saved, the construction efficiency is improved, the overall strength of the cement stabilized macadam layers can be effectively enhanced, cracks in the cement stabilized macadam layers are reduced, the phenomenon of relative movement among the multiple cement stabilized macadam layers is prevented, and therefore the service time of a road is greatly prolonged.
本发明公开了一种水泥稳定碎石层的施工方法,包括以下步骤:(1)施工场地准备;(2)设置水泥稳定碎石层间连接件;(3)铺设水泥稳定碎石底层和水泥稳定碎石中层;(4)铺设水泥稳定碎石顶层;(5)将所有连接件内的内壳体拔起拆除,之后在连接件的内部灌注混凝土,并将连接件的内部包括多个通孔全部灌注满;(6)养护。本发明施工便捷,节省施工费用,提高施工效率,能够有效加强水泥稳定碎石层的整体强度,减少水泥稳定碎石层上的裂缝产生,防止多层水泥稳定碎石层之间出现相对移动的现象,从而大大延长道路的使用时间。
Construction method of cement stabilized macadam layer
The invention discloses a construction method of a cement stabilized macadam layer. The construction method comprises the following steps: (1) preparation of a construction site; (2) connecting pieces between cement stabilized macadam layers are arranged; (3) laying a cement stabilized macadam bottom layer and a cement stabilized macadam middle layer; (4) laying a cement stabilized macadam top layer; (5) the inner shells in all the connecting pieces are pulled up and dismantled, then concrete is poured into the connecting pieces, and the interiors, including the multiple through holes, of the connecting pieces are fully poured; and (6) curing. Construction is convenient, the construction cost is saved, the construction efficiency is improved, the overall strength of the cement stabilized macadam layers can be effectively enhanced, cracks in the cement stabilized macadam layers are reduced, the phenomenon of relative movement among the multiple cement stabilized macadam layers is prevented, and therefore the service time of a road is greatly prolonged.
本发明公开了一种水泥稳定碎石层的施工方法,包括以下步骤:(1)施工场地准备;(2)设置水泥稳定碎石层间连接件;(3)铺设水泥稳定碎石底层和水泥稳定碎石中层;(4)铺设水泥稳定碎石顶层;(5)将所有连接件内的内壳体拔起拆除,之后在连接件的内部灌注混凝土,并将连接件的内部包括多个通孔全部灌注满;(6)养护。本发明施工便捷,节省施工费用,提高施工效率,能够有效加强水泥稳定碎石层的整体强度,减少水泥稳定碎石层上的裂缝产生,防止多层水泥稳定碎石层之间出现相对移动的现象,从而大大延长道路的使用时间。
Construction method of cement stabilized macadam layer
一种水泥稳定碎石层的施工方法
DU ZHI (author) / LIANG DEBIN (author) / NI GANGGANG (author) / FENG YUKAI (author) / CHAI FANGDONG (author) / ZHANG PENGFEI (author) / CHENG YUANZHE (author) / LEE SEUNG-HO (author) / WANG DI (author) / ZHAO PENGYU (author)
2024-11-22
Patent
Electronic Resource
Chinese
Soil mold construction method for cement stabilized macadam base layer
European Patent Office | 2021
|Cement stabilized macadam vibration mixing construction method
European Patent Office | 2021
|