A platform for research: civil engineering, architecture and urbanism
Construction method of anti-frost heaving pile foundation for installing photovoltaic support in frozen soil area
The invention discloses a construction method of an anti-frost heaving pile foundation for installing a photovoltaic support in a frozen soil area. The construction method comprises the following steps that firstly, construction preparation is conducted, wherein site leveling, pile position measurement, material preparation, pile foundation burial depth, pile spacing and the arrangement form are conducted; 2, construction of a screw pile: manufacturing the screw pile, sinking the screw pile, and carrying out heat preservation treatment; 3, construction quality control; quality control in the construction process and quality detection after construction are conducted; by accurately measuring the pile position, reasonably determining the burial depth and the arrangement form of the pile foundation and combining the use of the spiral pile, the stability of the pile foundation in a frozen soil area is effectively improved, deformation and damage caused by frost heaving are reduced, and therefore the service life of the photovoltaic support is prolonged.
本发明公开了一种冻土区光伏支架安装用抗冻胀桩基础施工方法,包括以下步骤:步骤一、施工准备:场地平整、桩位测量、材料准备、桩基础埋深、桩间距和布置形式;步骤二、螺旋桩施工:螺旋桩的制作、螺旋桩的沉入、保温处理;步骤三、施工质量控制;施工过程中的质量控制、施工后的质量检测;通过精确测量桩位、合理确定桩基础的埋深以及布置形式,并结合螺旋桩的使用,有效提高了桩基础在冻土区的稳定性,减少了因冻胀引起的变形和破坏,从而延长了光伏支架的使用寿命。
Construction method of anti-frost heaving pile foundation for installing photovoltaic support in frozen soil area
The invention discloses a construction method of an anti-frost heaving pile foundation for installing a photovoltaic support in a frozen soil area. The construction method comprises the following steps that firstly, construction preparation is conducted, wherein site leveling, pile position measurement, material preparation, pile foundation burial depth, pile spacing and the arrangement form are conducted; 2, construction of a screw pile: manufacturing the screw pile, sinking the screw pile, and carrying out heat preservation treatment; 3, construction quality control; quality control in the construction process and quality detection after construction are conducted; by accurately measuring the pile position, reasonably determining the burial depth and the arrangement form of the pile foundation and combining the use of the spiral pile, the stability of the pile foundation in a frozen soil area is effectively improved, deformation and damage caused by frost heaving are reduced, and therefore the service life of the photovoltaic support is prolonged.
本发明公开了一种冻土区光伏支架安装用抗冻胀桩基础施工方法,包括以下步骤:步骤一、施工准备:场地平整、桩位测量、材料准备、桩基础埋深、桩间距和布置形式;步骤二、螺旋桩施工:螺旋桩的制作、螺旋桩的沉入、保温处理;步骤三、施工质量控制;施工过程中的质量控制、施工后的质量检测;通过精确测量桩位、合理确定桩基础的埋深以及布置形式,并结合螺旋桩的使用,有效提高了桩基础在冻土区的稳定性,减少了因冻胀引起的变形和破坏,从而延长了光伏支架的使用寿命。
Construction method of anti-frost heaving pile foundation for installing photovoltaic support in frozen soil area
一种冻土区光伏支架安装用抗冻胀桩基础施工方法
CHEN JIANGHONG (author) / SUN BINGGUI (author) / GENG YUGANG (author) / LI BINGBING (author) / WANG CONGJIE (author) / SHICHIROKU (author) / FENG QINGTENG (author) / MA TING (author) / FAN ZILONG (author) / LUO RUIJIE (author)
2024-11-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
F24S
Sonnenkollektoren
,
SOLAR HEAT COLLECTORS
/
H02S
GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRA-RED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, E.G. USING PHOTOVOLTAIC [PV] MODULES
,
Erzeugung elektrischer Energie durch Umwandlung von Infrarot-Strahlung, sichtbarem Licht oder ultraviolettem Licht, z.B. unter Verwendung von Photovoltaik [PV]-Modulen
European Patent Office | 2023
|European Patent Office | 2020
|European Patent Office | 2024
|European Patent Office | 2024
|