A platform for research: civil engineering, architecture and urbanism
Cross-water suspension tunnel
The invention relates to the field of equipment related to underwater tunnels, and provides a water-crossing suspension tunnel which comprises anchor cable wall foundations arranged on coast on the two sides of a water area respectively, and a plurality of tunnel bodies are arranged between the two anchor cable wall foundations. A tunnel entrance and exit is formed in the middle of the anchor cable wall foundation, a plurality of connecting cables are evenly arranged on the peripheral side wall of the tunnel entrance and exit, a plurality of sets of through cable penetrating holes are formed in the side wall of any set of tunnel body, and positioning connecting holes are formed between every two adjacent sets of cable penetrating holes. One end of each connecting cable is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on one side, and the other end of each connecting cable sequentially penetrates through the cable penetrating holes of the multiple tunnel bodies and then is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on the other side; elastic mounting rods are arranged in the positioning connecting holes between every two adjacent groups of tunnel bodies, and elastic mounting rods are also arranged at the connecting ends of the tunnel bodies and the tunnel entrance and exit and the connecting ends of the channel isolation walls in every two adjacent groups of tunnel bodies.
本发明涉及水下隧道相关的设备领域,提供了一种跨水悬浮隧道,包括分别设置在水域两边的海岸上的锚索墙基,两组锚索墙基之间设置有多组隧道本体;锚索墙基的中部设置有隧道出入口,隧道出入口的外周侧壁上均匀设置有多条连接缆索,任一一组隧道本体的侧壁上设置有多组贯通的穿索孔,相邻的两组穿索孔之间设置有定位连接孔;每条连接缆索的一端设置在一侧海岸上的隧道出入口的外周侧壁上,每条连接缆索的另一端顺序穿过多个隧道本体的穿索孔后,设置在另一侧海岸上的隧道出入口的外周侧壁上;相邻的两组隧道本体之间的定位连接孔内设置有弹性安装杆,隧道本体与隧道出入口的连接端、及相邻两组隧道本体内部的通道隔离壁连接端也设置有弹性安装杆。
Cross-water suspension tunnel
The invention relates to the field of equipment related to underwater tunnels, and provides a water-crossing suspension tunnel which comprises anchor cable wall foundations arranged on coast on the two sides of a water area respectively, and a plurality of tunnel bodies are arranged between the two anchor cable wall foundations. A tunnel entrance and exit is formed in the middle of the anchor cable wall foundation, a plurality of connecting cables are evenly arranged on the peripheral side wall of the tunnel entrance and exit, a plurality of sets of through cable penetrating holes are formed in the side wall of any set of tunnel body, and positioning connecting holes are formed between every two adjacent sets of cable penetrating holes. One end of each connecting cable is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on one side, and the other end of each connecting cable sequentially penetrates through the cable penetrating holes of the multiple tunnel bodies and then is arranged on the peripheral side wall of the tunnel entrance and exit on the coast on the other side; elastic mounting rods are arranged in the positioning connecting holes between every two adjacent groups of tunnel bodies, and elastic mounting rods are also arranged at the connecting ends of the tunnel bodies and the tunnel entrance and exit and the connecting ends of the channel isolation walls in every two adjacent groups of tunnel bodies.
本发明涉及水下隧道相关的设备领域,提供了一种跨水悬浮隧道,包括分别设置在水域两边的海岸上的锚索墙基,两组锚索墙基之间设置有多组隧道本体;锚索墙基的中部设置有隧道出入口,隧道出入口的外周侧壁上均匀设置有多条连接缆索,任一一组隧道本体的侧壁上设置有多组贯通的穿索孔,相邻的两组穿索孔之间设置有定位连接孔;每条连接缆索的一端设置在一侧海岸上的隧道出入口的外周侧壁上,每条连接缆索的另一端顺序穿过多个隧道本体的穿索孔后,设置在另一侧海岸上的隧道出入口的外周侧壁上;相邻的两组隧道本体之间的定位连接孔内设置有弹性安装杆,隧道本体与隧道出入口的连接端、及相邻两组隧道本体内部的通道隔离壁连接端也设置有弹性安装杆。
Cross-water suspension tunnel
一种跨水悬浮隧道
LIU CHUANMING (author) / LIU CHANG (author) / GAO CHENCHEN (author)
2024-11-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen