A platform for research: civil engineering, architecture and urbanism
Inland river immersed tube tunnel construction multifunctional ship with segmented cross beams and assembling method of inland river immersed tube tunnel construction multifunctional ship
The invention relates to an inland river immersed tunnel construction multifunctional ship with segmented cross beams and an assembling method of the inland river immersed tunnel construction multifunctional ship, and belongs to the technical field of ships. The multifunctional ship comprises two operation barges, two cross beams, an auxiliary beam connecting seat and an auxiliary beam, hinge seats are arranged at the positions, close to the bow end and the stern end, of the operation barges correspondingly, and the hinge seats on the two operation barges are oppositely arranged. The cross beam comprises two pre-assembling sections and a hoisting section which is detachably butted between the two pre-assembling sections; the two pre-assembling sections are respectively hinged to hinging seats which are oppositely arranged on the two operation barges; the auxiliary beam connecting seats are arranged on the two operation barges in pairs; the auxiliary beam is used for being connected with the two operation barges to lock the two operation barges before the hoisting section is in butt joint with the two preassembled sections, and the two ends of the auxiliary beam are detachably connected to the auxiliary beam connecting bases arranged in pairs. The cross beam of the multifunctional ship is connected to the operation barge in a hinged mode, the cross beam is of a sectional structure, and accurate assembly can be achieved in the uneven environment on the sea only by connecting the hoisting section between the two preassembled sections.
本发明涉及一种具有分段横梁的内河沉管隧道施工多功能船及其组装方法,属于船舶技术领域。该多功能船包括两艘作业驳、两根横梁、辅助梁连接座和辅助梁;作业驳靠近艏端和艉端分别设有铰接座,两艘作业驳上的铰接座相对设置;横梁包括两个预装段和可拆卸对接于两个预装段之间的吊装段,两个预装段分别铰接于两艘作业驳上相对设置的铰接座;辅助梁连接座成对设置于两艘作业驳上;辅助梁用于在吊装段与两个预装段对接前连接两艘作业驳以锁固两艘作业驳,辅助梁的两端可拆卸连接于成对设置的辅助梁连接座。多功能船的横梁采用铰接方式连接于作业驳,且横梁为分段式结构,只需将吊装段连接于两预装段之间,即可在海上起伏不平的环境下实现精准组装。
Inland river immersed tube tunnel construction multifunctional ship with segmented cross beams and assembling method of inland river immersed tube tunnel construction multifunctional ship
The invention relates to an inland river immersed tunnel construction multifunctional ship with segmented cross beams and an assembling method of the inland river immersed tunnel construction multifunctional ship, and belongs to the technical field of ships. The multifunctional ship comprises two operation barges, two cross beams, an auxiliary beam connecting seat and an auxiliary beam, hinge seats are arranged at the positions, close to the bow end and the stern end, of the operation barges correspondingly, and the hinge seats on the two operation barges are oppositely arranged. The cross beam comprises two pre-assembling sections and a hoisting section which is detachably butted between the two pre-assembling sections; the two pre-assembling sections are respectively hinged to hinging seats which are oppositely arranged on the two operation barges; the auxiliary beam connecting seats are arranged on the two operation barges in pairs; the auxiliary beam is used for being connected with the two operation barges to lock the two operation barges before the hoisting section is in butt joint with the two preassembled sections, and the two ends of the auxiliary beam are detachably connected to the auxiliary beam connecting bases arranged in pairs. The cross beam of the multifunctional ship is connected to the operation barge in a hinged mode, the cross beam is of a sectional structure, and accurate assembly can be achieved in the uneven environment on the sea only by connecting the hoisting section between the two preassembled sections.
本发明涉及一种具有分段横梁的内河沉管隧道施工多功能船及其组装方法,属于船舶技术领域。该多功能船包括两艘作业驳、两根横梁、辅助梁连接座和辅助梁;作业驳靠近艏端和艉端分别设有铰接座,两艘作业驳上的铰接座相对设置;横梁包括两个预装段和可拆卸对接于两个预装段之间的吊装段,两个预装段分别铰接于两艘作业驳上相对设置的铰接座;辅助梁连接座成对设置于两艘作业驳上;辅助梁用于在吊装段与两个预装段对接前连接两艘作业驳以锁固两艘作业驳,辅助梁的两端可拆卸连接于成对设置的辅助梁连接座。多功能船的横梁采用铰接方式连接于作业驳,且横梁为分段式结构,只需将吊装段连接于两预装段之间,即可在海上起伏不平的环境下实现精准组装。
Inland river immersed tube tunnel construction multifunctional ship with segmented cross beams and assembling method of inland river immersed tube tunnel construction multifunctional ship
具有分段横梁的内河沉管隧道施工多功能船及其组装方法
LI LI (author) / LIU MING (author) / LIU JUNLIANG (author) / XU BO (author) / ZHANG YIGE (author) / LI QIUSHI (author) / WANG HONGLEI (author) / ZHANG YE (author) / LIU YANG (author) / SUN PEIQI (author)
2024-12-06
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Dry dock system for prefabricating inland river immersed tube and construction process thereof
European Patent Office | 2024
|Combined immersed tube joint for immersed tube tunnel and construction method
European Patent Office | 2023
|Construction method of immersed tube joint in immersed tube tunnel and immersed tube joint structure
European Patent Office | 2021
|