A platform for research: civil engineering, architecture and urbanism
Efficient bridge concrete pouring formwork system and construction method thereof
The invention discloses an efficient bridge concrete pouring formwork system and a construction method thereof.The efficient bridge concrete pouring formwork system comprises first pouring formworks, second pouring formworks are symmetrically arranged on the outer sides of the first pouring formworks, and the two first pouring formworks and the two second pouring formworks are symmetrically arranged; one side of the first pouring formwork and one side of the second pouring formwork are both connected with mounting clamping bases in a clamped mode, a first supporting and fixing plate and a second supporting and fixing plate are symmetrically arranged on the outer side of the first pouring formwork, and one side of the first supporting and fixing plate and one side of the second supporting and fixing plate are both fixedly connected with hydraulic push rods. During construction, the first pouring formwork and the second pouring formwork are clamped and fixed through the mounting clamping base, then the lower limiting frame is fixed to the lower end of the outer side of the first pouring formwork, the upper limiting frame is fixed to the upper end of the outer side of the first pouring formwork, and then the top-layer pouring splash-proof base is mounted on the tops of the first pouring formwork and the second pouring formwork.
本发明公开了一种高效桥梁混凝土浇筑模板体系及其施工方法,包括第一浇筑模板,所述第一浇筑模板的外侧对称设置有第二浇筑模板,所述第一浇筑模板和第二浇筑模板均对称设置有两个,所述第一浇筑模板和第二浇筑模板的一侧均卡合连接有安装卡座,所述第一浇筑模板的外侧对称设置有第一支撑固定板和第二支撑固定板,所述第一支撑固定板和第二支撑固定板的一侧均固定连接有液压推杆,使用时,先将第一浇筑模板和第二浇筑模板之间通过安装卡座进行卡合固定,然后将下限位框固定在第一浇筑模板外侧的下端,再将上限位框固定在第一浇筑模板外侧的上端,继而将顶层浇筑防溅座安装在第一浇筑模板和第二浇筑模板的顶部。
Efficient bridge concrete pouring formwork system and construction method thereof
The invention discloses an efficient bridge concrete pouring formwork system and a construction method thereof.The efficient bridge concrete pouring formwork system comprises first pouring formworks, second pouring formworks are symmetrically arranged on the outer sides of the first pouring formworks, and the two first pouring formworks and the two second pouring formworks are symmetrically arranged; one side of the first pouring formwork and one side of the second pouring formwork are both connected with mounting clamping bases in a clamped mode, a first supporting and fixing plate and a second supporting and fixing plate are symmetrically arranged on the outer side of the first pouring formwork, and one side of the first supporting and fixing plate and one side of the second supporting and fixing plate are both fixedly connected with hydraulic push rods. During construction, the first pouring formwork and the second pouring formwork are clamped and fixed through the mounting clamping base, then the lower limiting frame is fixed to the lower end of the outer side of the first pouring formwork, the upper limiting frame is fixed to the upper end of the outer side of the first pouring formwork, and then the top-layer pouring splash-proof base is mounted on the tops of the first pouring formwork and the second pouring formwork.
本发明公开了一种高效桥梁混凝土浇筑模板体系及其施工方法,包括第一浇筑模板,所述第一浇筑模板的外侧对称设置有第二浇筑模板,所述第一浇筑模板和第二浇筑模板均对称设置有两个,所述第一浇筑模板和第二浇筑模板的一侧均卡合连接有安装卡座,所述第一浇筑模板的外侧对称设置有第一支撑固定板和第二支撑固定板,所述第一支撑固定板和第二支撑固定板的一侧均固定连接有液压推杆,使用时,先将第一浇筑模板和第二浇筑模板之间通过安装卡座进行卡合固定,然后将下限位框固定在第一浇筑模板外侧的下端,再将上限位框固定在第一浇筑模板外侧的上端,继而将顶层浇筑防溅座安装在第一浇筑模板和第二浇筑模板的顶部。
Efficient bridge concrete pouring formwork system and construction method thereof
一种高效桥梁混凝土浇筑模板体系及其施工方法
DING ZHAOLU (author) / BING LIHUA (author) / TANG LIYUAN (author) / FENG LEI (author) / LIANG QIHANG (author)
2024-12-06
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Formwork for concrete pouring and pouring method thereof
European Patent Office | 2022
|Concrete square columnar pouring formwork and construction method thereof
European Patent Office | 2021
|