Dismantling method for concrete-filled steel tube arch bridge
The invention provides a dismantling method for a concrete-filled steel tube arch bridge. The dismantling method comprises the following steps that firstly, a blasting part is divided; 2, dividing blasting areas of all the blasting parts; thirdly, manual cutting is conducted; fourthly, blast holes in all the blasting areas are constructed; 5, charging each blast hole and installing a detonating element; sixthly, a transverse cutting rope is installed; a plurality of transverse cutting ropes are installed on the side walls of the third blasting area, the fourth blasting area, the fifth blasting area and the sixth blasting area; 7, mounting a detonating network; eighthly, transverse cutting ropes are used for cutting; ninthly, detonating is conducted; sequentially detonating from left to right or from right to left by adopting a delayed detonating technology; and 10, checking after explosion. The dismantling efficiency and safety of the concrete-filled steel tube arch bridge are improved.
本发明提供了一种钢管混凝土拱桥的拆除方法,其包括如下步骤:步骤一:爆破部分划分;步骤二:各爆破部分的爆破区划分;步骤三:人工切割;步骤四:各爆破区炮孔施工;步骤五:在各炮孔内装药并安装起爆元件;步骤六:安装横向切割索;在第三爆破区、第四爆破区、第五爆破区、第六爆破区的侧壁上安装多道横向切割索;步骤七:起爆网路安装;步骤八:横向切割索切割;步骤九:起爆;采用延时起爆技术从左至右或从右至左依次起爆;步骤十:爆后检查。本发明提高了钢管混凝土拱桥拆除的效率和安全性。
Dismantling method for concrete-filled steel tube arch bridge
The invention provides a dismantling method for a concrete-filled steel tube arch bridge. The dismantling method comprises the following steps that firstly, a blasting part is divided; 2, dividing blasting areas of all the blasting parts; thirdly, manual cutting is conducted; fourthly, blast holes in all the blasting areas are constructed; 5, charging each blast hole and installing a detonating element; sixthly, a transverse cutting rope is installed; a plurality of transverse cutting ropes are installed on the side walls of the third blasting area, the fourth blasting area, the fifth blasting area and the sixth blasting area; 7, mounting a detonating network; eighthly, transverse cutting ropes are used for cutting; ninthly, detonating is conducted; sequentially detonating from left to right or from right to left by adopting a delayed detonating technology; and 10, checking after explosion. The dismantling efficiency and safety of the concrete-filled steel tube arch bridge are improved.
本发明提供了一种钢管混凝土拱桥的拆除方法,其包括如下步骤:步骤一:爆破部分划分;步骤二:各爆破部分的爆破区划分;步骤三:人工切割;步骤四:各爆破区炮孔施工;步骤五:在各炮孔内装药并安装起爆元件;步骤六:安装横向切割索;在第三爆破区、第四爆破区、第五爆破区、第六爆破区的侧壁上安装多道横向切割索;步骤七:起爆网路安装;步骤八:横向切割索切割;步骤九:起爆;采用延时起爆技术从左至右或从右至左依次起爆;步骤十:爆后检查。本发明提高了钢管混凝土拱桥拆除的效率和安全性。
Dismantling method for concrete-filled steel tube arch bridge
一种钢管混凝土拱桥的拆除方法
HUANG LIANG (author) / ZHANG SUOQIAN (author) / HAN KELIN (author) / HUANG WEI (author) / SHU XIN (author) / XIAO ZHIPENG (author) / YANG JUNCHEN (author)
2024-12-06
Patent
Electronic Resource
Chinese
Demolition and construction integrated dismantling method for concrete-filled steel tube arch bridge
European Patent Office | 2023
|Main arch and stiff framework-concrete filled steel tube arch bridge
European Patent Office | 2023
|