Soft stratum reinforcing method based on pile foundation
The invention relates to a soft stratum reinforcing method based on a pile foundation. The soft stratum reinforcing method comprises the following steps that drilling operation is conducted at a set point position; after drilling to the set depth, a drill rod of the drilling machine is lifted, and while the drill rod is lifted, a mixed liquid of a curing agent and water is sprayed out of the bottom of the drill rod in a rotary spraying mode so that the soil body reserved in the drill hole can be changed into a flow state, and a flow-state solidified soil liquid is formed; after the liquid level of the fluid-state solidified soil liquid and the bottom face of the drill hole reach a set distance, spraying of the mixed liquid of the curing agent and the water is stopped, and the drill rod continues to be lifted upwards till leaving the drill hole; and the multiple prefabricated piles are pressed into the drilled hole section by section till the top face of the uppermost prefabricated solidified soil pile is flush with the ground. By the adoption of the reinforcing method, the reinforcing effect is good.
本发明涉及一种基于桩基的软弱地层加固方法,包括以下步骤:在设定点位进行钻孔作业;钻探至设定深度后,对钻机的钻杆进行上提,钻杆上提的同时,钻杆底部旋喷喷出固化剂和水的混合液体以使得钻孔内预留的土体变为流态,形成流态固化土液;待流态固化土液液位与钻孔底面达到设定距离后,停止固化剂和水的混合液的喷出,钻杆继续上提直至离开钻孔;将多个预制桩逐节压入钻孔中直至最上方的预制固化土桩顶面与地面平齐,采用本发明的加固方法加固效果好。
Soft stratum reinforcing method based on pile foundation
The invention relates to a soft stratum reinforcing method based on a pile foundation. The soft stratum reinforcing method comprises the following steps that drilling operation is conducted at a set point position; after drilling to the set depth, a drill rod of the drilling machine is lifted, and while the drill rod is lifted, a mixed liquid of a curing agent and water is sprayed out of the bottom of the drill rod in a rotary spraying mode so that the soil body reserved in the drill hole can be changed into a flow state, and a flow-state solidified soil liquid is formed; after the liquid level of the fluid-state solidified soil liquid and the bottom face of the drill hole reach a set distance, spraying of the mixed liquid of the curing agent and the water is stopped, and the drill rod continues to be lifted upwards till leaving the drill hole; and the multiple prefabricated piles are pressed into the drilled hole section by section till the top face of the uppermost prefabricated solidified soil pile is flush with the ground. By the adoption of the reinforcing method, the reinforcing effect is good.
本发明涉及一种基于桩基的软弱地层加固方法,包括以下步骤:在设定点位进行钻孔作业;钻探至设定深度后,对钻机的钻杆进行上提,钻杆上提的同时,钻杆底部旋喷喷出固化剂和水的混合液体以使得钻孔内预留的土体变为流态,形成流态固化土液;待流态固化土液液位与钻孔底面达到设定距离后,停止固化剂和水的混合液的喷出,钻杆继续上提直至离开钻孔;将多个预制桩逐节压入钻孔中直至最上方的预制固化土桩顶面与地面平齐,采用本发明的加固方法加固效果好。
Soft stratum reinforcing method based on pile foundation
一种基于桩基的软弱地层加固方法
CHU FENG (author) / ZHANG QIANQING (author) / QI DELONG (author) / ZHANG ZIJUN (author) / LI ZHENBAO (author) / CUI WEI (author) / LI JINLIANG (author)
2024-12-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Stratum reinforcing method for shield laterally penetrating river-adjacent bridge pile foundation
European Patent Office | 2024
|Deep foundation pit reinforcing method for strong permeable soft stratum
European Patent Office | 2024
|Composite pile foundation structure for reinforcing soft soil foundation and reinforcing method
European Patent Office | 2024
|