A platform for research: civil engineering, architecture and urbanism
Pile pulling construction method of hydraulic full-sleeve full-slewing drilling machine
The embodiment of the invention discloses a pile pulling construction method and device for a hydraulic full-sleeve full-slewing drilling machine, electronic equipment and a storage medium, and relates to the technical field of pile foundation dismantling construction. Comprising the following steps of construction preparation, pipeline exploring and digging, pile pulling pipeline protection, pile position lofting and platform laying, pile pulling drilling machine in-place, sleeve embedding and drilling, obstacle removing, waste pile hoisting away, pile hole checking, pile hole backfilling and sleeve pulling out. The hydraulic full-sleeve full-slewing drilling machine is high in construction speed, is hydraulically driven, is strong in power, and can quickly press a sleeve into a pile body and rotationally cut the sleeve, so that the construction period is greatly shortened; noise is low, noise generated by hydraulic driving is far lower than that generated by a traditional mechanical hammering method, a vibratory hammer method, a drilling machine drilling coring pile pulling method and the like, civilized construction can be achieved, interference to surrounding residents and the environment is reduced, equipment is simple, the site requirement is relatively low, the application range is wide, and the utilization rate and economic benefits of the equipment are improved.
本发明实施例公开了一种液压全套筒全回转钻机拔桩施工方法、装置、电子设备及存储介质,涉及桩基拆除施工技术领域。包括以下步骤:施工准备,管线探挖,拔桩管线保护,桩位放样及平台铺设,拔桩钻机就位,套筒埋设与钻进,障碍物清除,废桩吊离,桩孔检查,桩孔回填及套管拔除。本发明施工速度快,液压全套筒全回转钻机采用液压驱动,动力强劲,能够迅速将套管压入桩体并旋转切割,大大缩短了施工周期;噪音低,液压驱动产生的噪音远低于传统的机械锤击法、振动锤法、钻机钻孔取芯拔桩法等,有利于实现文明施工,减少对周围居民和环境的干扰,设备简单,场地要求相对较低,适用范围广,提高了设备的利用率和经济效益。
Pile pulling construction method of hydraulic full-sleeve full-slewing drilling machine
The embodiment of the invention discloses a pile pulling construction method and device for a hydraulic full-sleeve full-slewing drilling machine, electronic equipment and a storage medium, and relates to the technical field of pile foundation dismantling construction. Comprising the following steps of construction preparation, pipeline exploring and digging, pile pulling pipeline protection, pile position lofting and platform laying, pile pulling drilling machine in-place, sleeve embedding and drilling, obstacle removing, waste pile hoisting away, pile hole checking, pile hole backfilling and sleeve pulling out. The hydraulic full-sleeve full-slewing drilling machine is high in construction speed, is hydraulically driven, is strong in power, and can quickly press a sleeve into a pile body and rotationally cut the sleeve, so that the construction period is greatly shortened; noise is low, noise generated by hydraulic driving is far lower than that generated by a traditional mechanical hammering method, a vibratory hammer method, a drilling machine drilling coring pile pulling method and the like, civilized construction can be achieved, interference to surrounding residents and the environment is reduced, equipment is simple, the site requirement is relatively low, the application range is wide, and the utilization rate and economic benefits of the equipment are improved.
本发明实施例公开了一种液压全套筒全回转钻机拔桩施工方法、装置、电子设备及存储介质,涉及桩基拆除施工技术领域。包括以下步骤:施工准备,管线探挖,拔桩管线保护,桩位放样及平台铺设,拔桩钻机就位,套筒埋设与钻进,障碍物清除,废桩吊离,桩孔检查,桩孔回填及套管拔除。本发明施工速度快,液压全套筒全回转钻机采用液压驱动,动力强劲,能够迅速将套管压入桩体并旋转切割,大大缩短了施工周期;噪音低,液压驱动产生的噪音远低于传统的机械锤击法、振动锤法、钻机钻孔取芯拔桩法等,有利于实现文明施工,减少对周围居民和环境的干扰,设备简单,场地要求相对较低,适用范围广,提高了设备的利用率和经济效益。
Pile pulling construction method of hydraulic full-sleeve full-slewing drilling machine
一种液压全套筒全回转钻机拔桩施工方法
ZHANG JIANTONG (author) / CHEN ZIFAN (author) / LONG NANYANG (author) / LIAO FANG (author) / SONG JUN (author) / ZHANG QIAN (author) / HUANG QITONG (author) / NING YUNFANG (author) / LIU AN (author) / XIONG QIANG (author)
2024-12-06
Patent
Electronic Resource
Chinese
Full-rotation full-casing drilling machine and old pile pulling-out construction method thereof
European Patent Office | 2023
|Pile pulling construction technology of full-rotation casing pipe drilling machine
European Patent Office | 2024
|Full-casing full-slewing drilling machine hole-forming process
European Patent Office | 2021
|European Patent Office | 2016
|European Patent Office | 2023
|