Metal roof mounting method
The invention belongs to the technical field of building construction, and discloses a metal roof mounting method which comprises the following steps: mounting C-shaped secondary purlins into a profiling bottom plate on the ground to form bearing assemblies, and processing and combining a plurality of bearing assemblies; processing and combining a plurality of structural layer modules on the ground; the structural layer modules are installed on the bearing assemblies in a one-to-one correspondence mode, so that a plurality of assembling units are formed; the multiple splicing units are sequentially connected to the main purline, and every two adjacent splicing units are connected with each other; and after the multiple assembling units are installed, an upper layer structure is installed on the tops of the multiple assembling units. High-altitude operation can be reduced, the construction difficulty is lowered, and the construction efficiency is improved.
本发明属于建筑施工技术领域,公开了一种金属屋面安装方法,包括:于地面将C型次檩条安装至压型底板内,以形成承载组件,加工组合多个所述承载组件;于地面加工组合多个构造层模块;将所述构造层模块一一对应安装至所述承载组件,以形成多个拼装单元;将多个所述拼装单元依次连接至主檩条,相邻两个所述拼装单元之间相互连接;多个所述拼装单元安装完成后,在多个所述拼装单元顶部安装上层结构。本发明能够减少高空作业,降低施工难度,提高施工效率。
Metal roof mounting method
The invention belongs to the technical field of building construction, and discloses a metal roof mounting method which comprises the following steps: mounting C-shaped secondary purlins into a profiling bottom plate on the ground to form bearing assemblies, and processing and combining a plurality of bearing assemblies; processing and combining a plurality of structural layer modules on the ground; the structural layer modules are installed on the bearing assemblies in a one-to-one correspondence mode, so that a plurality of assembling units are formed; the multiple splicing units are sequentially connected to the main purline, and every two adjacent splicing units are connected with each other; and after the multiple assembling units are installed, an upper layer structure is installed on the tops of the multiple assembling units. High-altitude operation can be reduced, the construction difficulty is lowered, and the construction efficiency is improved.
本发明属于建筑施工技术领域,公开了一种金属屋面安装方法,包括:于地面将C型次檩条安装至压型底板内,以形成承载组件,加工组合多个所述承载组件;于地面加工组合多个构造层模块;将所述构造层模块一一对应安装至所述承载组件,以形成多个拼装单元;将多个所述拼装单元依次连接至主檩条,相邻两个所述拼装单元之间相互连接;多个所述拼装单元安装完成后,在多个所述拼装单元顶部安装上层结构。本发明能够减少高空作业,降低施工难度,提高施工效率。
Metal roof mounting method
金属屋面安装方法
HU KEXUAN (author) / WANG JIALUN (author) / ZHANG QIHANG (author) / ZHANG BIN (author) / JIA BAORONG (author) / CHEN YING (author) / ZHANG CHUNYU (author) / HUANG HAOKE (author) / CHEN XINGYANG (author)
2024-12-06
Patent
Electronic Resource
Chinese
Rope ladder for metal roof board mounting and metal roof board mounting method
European Patent Office | 2021
|