Block combination hoisting method for stage fence top of complex site stadium
The invention relates to a complex site stadium stage fence top block combination hoisting method. The method comprises the steps that firstly, winch equipment is installed; secondly, a temporary assembly jig frame platform is machined below the grid top installation position; 3, dividing the grid top into a plurality of blocks suitable for hoisting, and calculating hoisting points; step 4, assembling and splicing grid top sub-blocks on the jig frame platform; 5, hanging points and clamps are arranged on the top of the block grid, and temporary supporting and reinforcing components are additionally installed; step 6, mounting and fixing grid top davits; 7, connecting, hoisting and mounting the grid top blocks; 8, the grid top blocks and the upper hanging columns are connected, corrected and fixed, temporary fixing and reinforcing supports are arranged, the grid top of the first block is temporarily installed and fixed, and temporary reinforcing measures and supports for hoisting are removed; hoisting the grid top blocks in sequence; a large amount of high-altitude installation work is reduced, and the construction risk is reduced.
本发明涉及一种复杂场地场馆舞台珊顶分块组合吊装方法,步骤一:安装卷扬机设备;步骤二:在珊顶安装位置下方加工临时组装胎架平台;步骤三:将珊顶分割为合适吊装的若干块,计算出吊点;步骤四:在胎架平台上组装拼接珊顶分块;步骤五:在分块珊顶上设置吊点、卡具,加装临时支撑加固构件;步骤六:安装固定珊顶吊柱;步骤七:将珊顶分块连接、起吊、安装;步骤八:珊顶分块与上部吊柱连接、矫正、固定,设置临时固定加固支撑,使第一块分块珊顶临时安装固定,拆除吊装用临时加固措施、支撑;依次吊装珊顶分块;本发明减少大量的高空安装作业量,降低施工风险。
Block combination hoisting method for stage fence top of complex site stadium
The invention relates to a complex site stadium stage fence top block combination hoisting method. The method comprises the steps that firstly, winch equipment is installed; secondly, a temporary assembly jig frame platform is machined below the grid top installation position; 3, dividing the grid top into a plurality of blocks suitable for hoisting, and calculating hoisting points; step 4, assembling and splicing grid top sub-blocks on the jig frame platform; 5, hanging points and clamps are arranged on the top of the block grid, and temporary supporting and reinforcing components are additionally installed; step 6, mounting and fixing grid top davits; 7, connecting, hoisting and mounting the grid top blocks; 8, the grid top blocks and the upper hanging columns are connected, corrected and fixed, temporary fixing and reinforcing supports are arranged, the grid top of the first block is temporarily installed and fixed, and temporary reinforcing measures and supports for hoisting are removed; hoisting the grid top blocks in sequence; a large amount of high-altitude installation work is reduced, and the construction risk is reduced.
本发明涉及一种复杂场地场馆舞台珊顶分块组合吊装方法,步骤一:安装卷扬机设备;步骤二:在珊顶安装位置下方加工临时组装胎架平台;步骤三:将珊顶分割为合适吊装的若干块,计算出吊点;步骤四:在胎架平台上组装拼接珊顶分块;步骤五:在分块珊顶上设置吊点、卡具,加装临时支撑加固构件;步骤六:安装固定珊顶吊柱;步骤七:将珊顶分块连接、起吊、安装;步骤八:珊顶分块与上部吊柱连接、矫正、固定,设置临时固定加固支撑,使第一块分块珊顶临时安装固定,拆除吊装用临时加固措施、支撑;依次吊装珊顶分块;本发明减少大量的高空安装作业量,降低施工风险。
Block combination hoisting method for stage fence top of complex site stadium
一种复杂场地场馆舞台珊顶分块组合吊装方法
SHI QUNKAI (author) / FENG LINBO (author) / SHI LIJUN (author) / XU YABING (author) / LI JIANQIANG (author) / LU SEN (author) / LI PENG (author) / CHARAMU (author) / WANG ZHEN (author) / ZOU ZHILIAO (author)
2024-12-06
Patent
Electronic Resource
Chinese
Quick-release combined channel separation fence for stadium
European Patent Office | 2024
|FENCE FOUNDATION BLOCK AND FENCE FOUNDATION BLOCK CONSTRUCTION METHOD
European Patent Office | 2015
|