A platform for research: civil engineering, architecture and urbanism
Fabricated thermal-insulation dry-hanging stone integrated composite curtain wall and construction method thereof
The invention discloses an assembly type heat preservation dry hanging stone integrated composite curtain wall and a construction method thereof. The composite curtain wall comprises a multifunctional wallboard, a supporting unit and a positioning and reinforcing unit. The supporting unit is fixedly connected with the structural column in a non-destructive mode. One end of the positioning and reinforcing unit is fixedly connected with the supporting unit, and the other end of the positioning and reinforcing unit is stably connected with the multifunctional wallboard. The multifunctional wallboard is arranged on the positioning and reinforcing unit through connection modes such as bolt connection, clamping connection and bonding, the problem that falling is prone to occurring in a single connection mode is avoided, the integrality of the multifunctional wallboard is effectively improved by adopting the integrated construction technology, the heat preservation and energy saving effects are obviously enhanced, and then the multifunctional wallboard has the advantages of being simple in structure, convenient to use and high in practicability. The supporting units and the positioning and reinforcing units are fixedly connected in a bolt connection mode, the supporting units and the structural columns are fixedly connected in a bolt connection mode, damage to a main body structure is avoided, traditional welding operation is avoided, and the construction efficiency is remarkably improved.
本发明公开了一种装配式保温干挂石材一体化复合幕墙及其施工方法,该复合幕墙包括:多功能墙板、支撑单元及定位加固单元;所述支撑单元通过非破坏方式与结构柱固定连接;所述定位加固单元一端与所述支撑单元固定连接,另一端稳定连接所述多功能墙板。通过螺栓、卡接及粘接之类的连接方式将所述多功能墙板置于所述定位加固单元上,避免了单一连接方式容易发生脱落的问题,并且通过采用一体化施工技术有效增加了所述多功能墙板的整体性,使得保温节能效果明显增强,其次,所述支撑单元与所述定位加固单元,以及所述支撑单元与所述结构柱之间均通过螺栓连接方式进行连接固定,避免了对主体结构的破坏,并避免了传统焊接作业,显著提高施工效率。
Fabricated thermal-insulation dry-hanging stone integrated composite curtain wall and construction method thereof
The invention discloses an assembly type heat preservation dry hanging stone integrated composite curtain wall and a construction method thereof. The composite curtain wall comprises a multifunctional wallboard, a supporting unit and a positioning and reinforcing unit. The supporting unit is fixedly connected with the structural column in a non-destructive mode. One end of the positioning and reinforcing unit is fixedly connected with the supporting unit, and the other end of the positioning and reinforcing unit is stably connected with the multifunctional wallboard. The multifunctional wallboard is arranged on the positioning and reinforcing unit through connection modes such as bolt connection, clamping connection and bonding, the problem that falling is prone to occurring in a single connection mode is avoided, the integrality of the multifunctional wallboard is effectively improved by adopting the integrated construction technology, the heat preservation and energy saving effects are obviously enhanced, and then the multifunctional wallboard has the advantages of being simple in structure, convenient to use and high in practicability. The supporting units and the positioning and reinforcing units are fixedly connected in a bolt connection mode, the supporting units and the structural columns are fixedly connected in a bolt connection mode, damage to a main body structure is avoided, traditional welding operation is avoided, and the construction efficiency is remarkably improved.
本发明公开了一种装配式保温干挂石材一体化复合幕墙及其施工方法,该复合幕墙包括:多功能墙板、支撑单元及定位加固单元;所述支撑单元通过非破坏方式与结构柱固定连接;所述定位加固单元一端与所述支撑单元固定连接,另一端稳定连接所述多功能墙板。通过螺栓、卡接及粘接之类的连接方式将所述多功能墙板置于所述定位加固单元上,避免了单一连接方式容易发生脱落的问题,并且通过采用一体化施工技术有效增加了所述多功能墙板的整体性,使得保温节能效果明显增强,其次,所述支撑单元与所述定位加固单元,以及所述支撑单元与所述结构柱之间均通过螺栓连接方式进行连接固定,避免了对主体结构的破坏,并避免了传统焊接作业,显著提高施工效率。
Fabricated thermal-insulation dry-hanging stone integrated composite curtain wall and construction method thereof
装配式保温干挂石材一体化复合幕墙及其施工方法
XUE FEI (author) / LI ZONGJIA (author) / XU WENSHEN (author) / FENG XIANG (author)
2024-12-10
Patent
Electronic Resource
Chinese
Dry hanging stone curtain wall and construction method thereof
European Patent Office | 2023
|Dry hanging stone curtain wall construction method and curtain wall structure
European Patent Office | 2024
|Curtain wall construction method adopting stone dry hanging
European Patent Office | 2021
|Dry hanging stone curtain wall installation and construction method
European Patent Office | 2020
|