Construction method of guard rail type ballastless track bed
The invention relates to the technical field of railway ballastless track bed construction, in particular to a guard rail type ballastless track bed construction method. Comprising the steps of construction preparation, survey lofting and foundation mark survey setting, beam surface chiseling cleaning, sleeve connecting steel bar installation, base steel bar binding, bridge expansion joint embedded part installation, base and groove formwork installation, base concrete pouring and maintenance, isolation layer geotechnical cloth and elastic base plate laying, groove insulation steel bar framework installation and ballast bed bottom layer steel bar binding. The method comprises the following steps of: distributing double-block type sleepers, transporting tool rails, assembling double-block type track panels, roughly adjusting track lifting of the double-block type track panels, binding steel bars on the upper layer of a track bed, distributing guard wheel sleepers, assembling guard wheel track panels, roughly adjusting the sizes of the guard wheel track panels, mounting and adjusting track bed templates, finely adjusting the double-block type track panels for the first time, adjusting the sizes of the guard wheel track panels, and finely adjusting the double-block type track panels for the second time. The method comprises the steps of guard rail row size rechecking, ballast bed concrete pouring, stress relief, concrete curing and data acquisition.
本发明涉及铁路无砟轨道道床施工的技术领域,具体的说是一种护轮轨式无砟道床施工方法,包括施工准备、测量放样及基标测设、梁面凿毛清理、套筒连接钢筋安装、底座钢筋绑扎、桥梁伸缩缝预埋件安装、底座及凹槽模板安装、底座混凝土浇筑及养护、铺设隔离层土工布及弹性垫板、安装凹槽绝缘钢筋骨架、道床底层钢筋绑扎、散布双块式轨枕、工具轨运输及双块式轨排拼装、双块式轨排起道粗调、道床上层钢筋绑扎、散布护轮轨枕、护轮轨排拼装、护轮轨排尺寸粗调、道床模板安装及调整、双块式轨排精调第一遍、护轮轨排尺寸调整、双块式轨排精调第二遍、护轮轨排尺寸复核、道床混凝土浇筑、应力放散及混凝土养护、数据采集。
Construction method of guard rail type ballastless track bed
The invention relates to the technical field of railway ballastless track bed construction, in particular to a guard rail type ballastless track bed construction method. Comprising the steps of construction preparation, survey lofting and foundation mark survey setting, beam surface chiseling cleaning, sleeve connecting steel bar installation, base steel bar binding, bridge expansion joint embedded part installation, base and groove formwork installation, base concrete pouring and maintenance, isolation layer geotechnical cloth and elastic base plate laying, groove insulation steel bar framework installation and ballast bed bottom layer steel bar binding. The method comprises the following steps of: distributing double-block type sleepers, transporting tool rails, assembling double-block type track panels, roughly adjusting track lifting of the double-block type track panels, binding steel bars on the upper layer of a track bed, distributing guard wheel sleepers, assembling guard wheel track panels, roughly adjusting the sizes of the guard wheel track panels, mounting and adjusting track bed templates, finely adjusting the double-block type track panels for the first time, adjusting the sizes of the guard wheel track panels, and finely adjusting the double-block type track panels for the second time. The method comprises the steps of guard rail row size rechecking, ballast bed concrete pouring, stress relief, concrete curing and data acquisition.
本发明涉及铁路无砟轨道道床施工的技术领域,具体的说是一种护轮轨式无砟道床施工方法,包括施工准备、测量放样及基标测设、梁面凿毛清理、套筒连接钢筋安装、底座钢筋绑扎、桥梁伸缩缝预埋件安装、底座及凹槽模板安装、底座混凝土浇筑及养护、铺设隔离层土工布及弹性垫板、安装凹槽绝缘钢筋骨架、道床底层钢筋绑扎、散布双块式轨枕、工具轨运输及双块式轨排拼装、双块式轨排起道粗调、道床上层钢筋绑扎、散布护轮轨枕、护轮轨排拼装、护轮轨排尺寸粗调、道床模板安装及调整、双块式轨排精调第一遍、护轮轨排尺寸调整、双块式轨排精调第二遍、护轮轨排尺寸复核、道床混凝土浇筑、应力放散及混凝土养护、数据采集。
Construction method of guard rail type ballastless track bed
一种护轮轨式无砟道床施工方法
ZHANG XUEYI (author) / ZHANG ZHENGLEI (author) / LIAO KUNMING (author) / GOU ZHIFENG (author)
2024-12-13
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
High-speed rail ballastless track base plate construction method
European Patent Office | 2021
|Pouring mold for ballastless track leveling layer and ballastless track construction method
European Patent Office | 2024
|European Patent Office | 2020
|