Fabricated foam concrete post-grouting floor engineering construction method
A fabricated foam concrete post-grouting floor engineering construction method adopts a fabricated construction method and comprises the steps that a floor block is mounted on a floor base layer in an overhead mode, then foam concrete is filled in a cavity between the floor block and the floor base layer, and after the foam concrete is solidified, a floor engineering is completed. The construction method not only can improve the construction efficiency of the block material flooring engineering, but also can effectively guarantee the construction quality of the block material flooring engineering.
一种装配式泡沫混凝土后注浆楼地面工程施工方法,采用装配化施工方法,将楼地面块材架空安装在楼地面基层上,然后往楼地面块材与楼地面基层间的空腔内注满泡沫混凝土,当泡沫混凝土凝固后,楼地面工程即告完成。这种施工方法不仅能提高块状材料楼地面工程的施工效率,而且还能够有效保证其施工质量。
Fabricated foam concrete post-grouting floor engineering construction method
A fabricated foam concrete post-grouting floor engineering construction method adopts a fabricated construction method and comprises the steps that a floor block is mounted on a floor base layer in an overhead mode, then foam concrete is filled in a cavity between the floor block and the floor base layer, and after the foam concrete is solidified, a floor engineering is completed. The construction method not only can improve the construction efficiency of the block material flooring engineering, but also can effectively guarantee the construction quality of the block material flooring engineering.
一种装配式泡沫混凝土后注浆楼地面工程施工方法,采用装配化施工方法,将楼地面块材架空安装在楼地面基层上,然后往楼地面块材与楼地面基层间的空腔内注满泡沫混凝土,当泡沫混凝土凝固后,楼地面工程即告完成。这种施工方法不仅能提高块状材料楼地面工程的施工效率,而且还能够有效保证其施工质量。
Fabricated foam concrete post-grouting floor engineering construction method
一种装配式泡沫混凝土后注浆楼地面工程施工方法
NIU JUNPING (author) / WANG QINGHAO (author) / HUANG KEJIAN (author)
2024-12-13
Patent
Electronic Resource
Chinese
Fabricated concrete grouting construction auxiliary device
European Patent Office | 2024
|Fabricated concrete grouting connection stair and construction method
European Patent Office | 2023
|Foam concrete soil karst cave grouting construction method
European Patent Office | 2024
|