Split type prefabricated cabin construction method, split type prefabricated cabin and transformer substation
The invention relates to the technical field of transformer substations, and provides a split type prefabricated cabin construction method, a split type prefabricated cabin and a transformer substation, and the method comprises the steps: manufacturing a base frame, then installing a groove box and a copper bar on the base frame, then installing cabinet equipment, connecting wires, and installing a floor, and forming a base integration; manufacturing a shell frame, then integrating lighting, heating and ventilation, fire-fighting facilities and pipelines on the shell frame, and arranging interior and exterior decorations to form shell integration; and the shell integration and the base integration are mutually positioned and hermetically connected. According to the scheme of the invention, the base part and the shell part of the prefabricated cabin can be independently processed and respectively integrated, and can be synchronously constructed and integrated, so that the manufacturing efficiency of the prefabricated cabin is greatly improved. The equipment in the cabin does not need to enter and exit from the cabin door, so that the equipment is more convenient to integrate and install, and during subsequent replacement or maintenance, the shell only needs to be integrally hoisted away and then installed or directly replaced, so that the working efficiency can be effectively improved, and the operation is quick and convenient.
本发明涉及变电站技术领域,提供一种分体式预制舱构建方法、分体式预制舱及变电站,方法包括:制作底座框架,然后在底座框架上安装槽盒、铜排,随后安装机柜设备,接线,安装地板,形成底座集成;制作外壳框架,然后在外壳框架上集成照明、暖通、消防的设施及管线,并布置内外饰,形成外壳集成;将所述外壳集成和底座集成相互定位并密封连接。根据本发明的方案,本发明可以使得预制舱底座部分和外壳部分独立加工,分别集成,可同步进行构建集成,大大提高预制舱的制造效率。舱内设备无须从舱门进出舱,使得设备更加方便集成安装,而且后续更换或者维护时,只需将外壳整体吊走再装回或直接替换外壳即可,如此可以有效提高工作效率,操作快捷方便。
Split type prefabricated cabin construction method, split type prefabricated cabin and transformer substation
The invention relates to the technical field of transformer substations, and provides a split type prefabricated cabin construction method, a split type prefabricated cabin and a transformer substation, and the method comprises the steps: manufacturing a base frame, then installing a groove box and a copper bar on the base frame, then installing cabinet equipment, connecting wires, and installing a floor, and forming a base integration; manufacturing a shell frame, then integrating lighting, heating and ventilation, fire-fighting facilities and pipelines on the shell frame, and arranging interior and exterior decorations to form shell integration; and the shell integration and the base integration are mutually positioned and hermetically connected. According to the scheme of the invention, the base part and the shell part of the prefabricated cabin can be independently processed and respectively integrated, and can be synchronously constructed and integrated, so that the manufacturing efficiency of the prefabricated cabin is greatly improved. The equipment in the cabin does not need to enter and exit from the cabin door, so that the equipment is more convenient to integrate and install, and during subsequent replacement or maintenance, the shell only needs to be integrally hoisted away and then installed or directly replaced, so that the working efficiency can be effectively improved, and the operation is quick and convenient.
本发明涉及变电站技术领域,提供一种分体式预制舱构建方法、分体式预制舱及变电站,方法包括:制作底座框架,然后在底座框架上安装槽盒、铜排,随后安装机柜设备,接线,安装地板,形成底座集成;制作外壳框架,然后在外壳框架上集成照明、暖通、消防的设施及管线,并布置内外饰,形成外壳集成;将所述外壳集成和底座集成相互定位并密封连接。根据本发明的方案,本发明可以使得预制舱底座部分和外壳部分独立加工,分别集成,可同步进行构建集成,大大提高预制舱的制造效率。舱内设备无须从舱门进出舱,使得设备更加方便集成安装,而且后续更换或者维护时,只需将外壳整体吊走再装回或直接替换外壳即可,如此可以有效提高工作效率,操作快捷方便。
Split type prefabricated cabin construction method, split type prefabricated cabin and transformer substation
分体式预制舱构建方法、分体式预制舱及变电站
GU MINGFEI (author) / YU CHUNLIN (author) / YUAN DIFEI (author) / SU PEIQIU (author)
2024-12-13
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2024
|Prefabricated cabin type transformer substation composite structure
European Patent Office | 2022
|Prefabricated cabin electrical equipment module, prefabricated cabin and transformer substation
European Patent Office | 2022
|