A platform for research: civil engineering, architecture and urbanism
Construction waste roadbed construction method
The invention discloses a construction waste roadbed construction method, and relates to the technical field of roadbed construction, the construction waste roadbed construction method comprises the following construction steps: A) construction preparation; b) substrate treatment; c) paving and leveling; d) sprinkling water and sealing the materials; e) rolling; f) roadbed construction quality inspection; g) subgrade handover acceptance; and before subgrade handover acceptance in the step G, the construction from the step C to the step F is repeated to form an embankment, so that the top of the subgrade which is subjected to layered filling and tamping is used for arranging a pavement. According to the construction method of the construction waste roadbed, the construction quality of the construction waste roadbed is guaranteed by controlling the construction waste roadbed rolling machine combination, the technological parameters, the compaction degree, the PFWD modulus and the rebound deflection value of a special layer, and a construction waste roadbed filling layer filler selection method is provided. Therefore, the safety and the stability of the construction waste roadbed structure including the road surface are protected.
本发明公开了一种建筑垃圾路基施工方法,涉及路基施工技术领域,该建筑垃圾路基施工方法包括的施工步骤有:A)施工准备;B)基底处理;C)摊铺、整平;D)洒水闷料;E)碾压;F)路基施工质量检查;G)路基交工验收;在所述步骤G路基交工验收前,重复步骤C到步骤F的施工形成路堤,使得分层填筑并夯实的路基顶部用于布置路面。该建筑垃圾路基施工方法通过对建筑垃圾路基碾压机械组合及工艺参数、压实度、PFWD模量与对特殊层位的回弹弯沉值的控制,从而使建筑垃圾路基的施工质量得到保证,提出了建筑垃圾路基填筑层填料选择方法,进而保护了包括路面在内的建筑垃圾路基结构的安全性和稳定性。
Construction waste roadbed construction method
The invention discloses a construction waste roadbed construction method, and relates to the technical field of roadbed construction, the construction waste roadbed construction method comprises the following construction steps: A) construction preparation; b) substrate treatment; c) paving and leveling; d) sprinkling water and sealing the materials; e) rolling; f) roadbed construction quality inspection; g) subgrade handover acceptance; and before subgrade handover acceptance in the step G, the construction from the step C to the step F is repeated to form an embankment, so that the top of the subgrade which is subjected to layered filling and tamping is used for arranging a pavement. According to the construction method of the construction waste roadbed, the construction quality of the construction waste roadbed is guaranteed by controlling the construction waste roadbed rolling machine combination, the technological parameters, the compaction degree, the PFWD modulus and the rebound deflection value of a special layer, and a construction waste roadbed filling layer filler selection method is provided. Therefore, the safety and the stability of the construction waste roadbed structure including the road surface are protected.
本发明公开了一种建筑垃圾路基施工方法,涉及路基施工技术领域,该建筑垃圾路基施工方法包括的施工步骤有:A)施工准备;B)基底处理;C)摊铺、整平;D)洒水闷料;E)碾压;F)路基施工质量检查;G)路基交工验收;在所述步骤G路基交工验收前,重复步骤C到步骤F的施工形成路堤,使得分层填筑并夯实的路基顶部用于布置路面。该建筑垃圾路基施工方法通过对建筑垃圾路基碾压机械组合及工艺参数、压实度、PFWD模量与对特殊层位的回弹弯沉值的控制,从而使建筑垃圾路基的施工质量得到保证,提出了建筑垃圾路基填筑层填料选择方法,进而保护了包括路面在内的建筑垃圾路基结构的安全性和稳定性。
Construction waste roadbed construction method
一种建筑垃圾路基施工方法
XU LEI (author) / LEI YUXIANG (author) / GAO ZHUANG (author) / CHEN JUNHUA (author) / FU QIANG (author) / PENG YUNHUI (author)
2024-12-17
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE