A platform for research: civil engineering, architecture and urbanism
Prestressed pipe pile perpendicularity rapid measuring device and using method thereof
The invention discloses a prestressed pipe pile perpendicularity rapid measuring device and a using method thereof, belongs to the field of pipe pile construction devices, and can solve the problems that in the background technology, during construction, in a traditional method, two theodolites are adopted for observing vertical deviation and adjustment in the pile sinking process at a fixed point, the method has the advantages of being accurate in detection and adjustment, long in adjustment time of a detection instrument, and low in measurement accuracy. And the hammering pile sinking efficiency is reduced. In addition, the problems that in a traditional method, a leveling instrument is attached to a pipe pile body, a pile machine is commanded to adjust by observing the bubble position of a leveling pipe, and the method has the advantages of being convenient to measure and large in error can be solved. The method comprises the steps that S1, the device is placed in a place where piling is needed, and a positioning pin is inserted into soil to fix the device; s2, a first screw rod is rotated to adjust the perpendicularity of a first arc-shaped plate; s3, the tubular pile 4 is hoisted into an upper positioning ring through a crane, and an electric telescopic rod is powered on to drive two first arc-shaped plates to clamp and fix the tubular pile; and S4, hammering and piling are conducted on the pipe pile.
一种预应力管桩垂直度快速测量装置及其使用方法,管桩施工用装置领域,可以解决背景技术中提出的:在施工时,传统方法采用两台经纬仪定点观测沉桩过程的垂直偏差及调校,这种方法优点是检测调校精准,缺点是检测仪器调校时间长,使得锤击沉桩效率降低的问题。并且还能解决传统方法使用水平尺贴靠在管桩桩身,通过观察水准管气泡位置指挥桩机调校,这种方法优点是测量方便,缺点是误差较大问题。步骤为:S1:将本装置放置在需要打桩的地点,将定位销插入土壤内对本装置进行固定;S2:转动螺杆一调节弧形板一的垂直度;S3:通过吊车将管桩4吊入上定位环内,将电动伸缩杆通电带动两个弧形板一对管桩进行夹持固定;S4:对管桩进行锤击打桩。
Prestressed pipe pile perpendicularity rapid measuring device and using method thereof
The invention discloses a prestressed pipe pile perpendicularity rapid measuring device and a using method thereof, belongs to the field of pipe pile construction devices, and can solve the problems that in the background technology, during construction, in a traditional method, two theodolites are adopted for observing vertical deviation and adjustment in the pile sinking process at a fixed point, the method has the advantages of being accurate in detection and adjustment, long in adjustment time of a detection instrument, and low in measurement accuracy. And the hammering pile sinking efficiency is reduced. In addition, the problems that in a traditional method, a leveling instrument is attached to a pipe pile body, a pile machine is commanded to adjust by observing the bubble position of a leveling pipe, and the method has the advantages of being convenient to measure and large in error can be solved. The method comprises the steps that S1, the device is placed in a place where piling is needed, and a positioning pin is inserted into soil to fix the device; s2, a first screw rod is rotated to adjust the perpendicularity of a first arc-shaped plate; s3, the tubular pile 4 is hoisted into an upper positioning ring through a crane, and an electric telescopic rod is powered on to drive two first arc-shaped plates to clamp and fix the tubular pile; and S4, hammering and piling are conducted on the pipe pile.
一种预应力管桩垂直度快速测量装置及其使用方法,管桩施工用装置领域,可以解决背景技术中提出的:在施工时,传统方法采用两台经纬仪定点观测沉桩过程的垂直偏差及调校,这种方法优点是检测调校精准,缺点是检测仪器调校时间长,使得锤击沉桩效率降低的问题。并且还能解决传统方法使用水平尺贴靠在管桩桩身,通过观察水准管气泡位置指挥桩机调校,这种方法优点是测量方便,缺点是误差较大问题。步骤为:S1:将本装置放置在需要打桩的地点,将定位销插入土壤内对本装置进行固定;S2:转动螺杆一调节弧形板一的垂直度;S3:通过吊车将管桩4吊入上定位环内,将电动伸缩杆通电带动两个弧形板一对管桩进行夹持固定;S4:对管桩进行锤击打桩。
Prestressed pipe pile perpendicularity rapid measuring device and using method thereof
一种预应力管桩垂直度快速测量装置及其使用方法
MA SHUXIA (author) / MA XUEZHI (author) / ZHU HONGZHI (author) / BAO MINGHUI (author) / MEI YUQING (author)
2024-12-24
Patent
Electronic Resource
Chinese
Rapid measuring device for perpendicularity of prestressed pipe pile
European Patent Office | 2024
|Device for controlling perpendicularity of prestressed concrete pipe pile
European Patent Office | 2020
|Mountain photovoltaic concrete pipe pile perpendicularity measuring device
European Patent Office | 2024
|PHC pipe pile perpendicularity monitoring device and using method thereof
European Patent Office | 2023
|