The invention relates to the technical field of electric power engineering, in particular to a power transmission tower and a construction method thereof.The power transmission tower is arranged at an old tower position, the old tower position is provided with a plurality of old tower footings, and the old tower footings are horizontally and dispersedly arranged; defining a polygon formed by connecting the centers of the old tower footings clockwise or anticlockwise by a straight line as a first polygon; the power transmission tower comprises a tower body and a plurality of tower foundations which are sequentially arranged from top to bottom, the tower foundations are horizontally and dispersedly arranged, and a polygon formed by connecting the centers of all the old tower foundations clockwise or anticlockwise through a straight line is defined as a second polygon; the second polygons and the first polygons are concentric, and all the vertexes of the first polygons and all the vertexes of the second polygons are alternately arranged at intervals, so that all the tower foundations and all the old tower foundations are horizontally staggered, the tower foundations do not need to be constructed after the old tower foundations are dismantled, the construction period of the power transmission tower is shortened, land does not need to be newly added, and land compensation is avoided.
本发明涉及电力工程技术领域,特别是涉及一种输电塔及其施工方法,本发明的输电塔设置在旧塔位处,旧塔位设有多个旧塔基,各旧塔基水平分散布置;定义以直线沿顺时针或逆时针方向连接各旧塔基的中心所形成的多边形为第一多边形;输电塔包括从上至下依次布置的塔体和塔基础,塔基础水平分散布置有多个,定义以直线沿顺时针或逆时针方向连接各旧塔基的中心所形成的多边形为第二多边形;第二多边形和第一多边形同心且第一多边形的各顶点以及第二多边形的各顶点交替间隔布置,因此各塔基础与各旧塔基水平错开,不需要在拆除旧塔基后再施工塔基础,缩短了输电塔的施工周期,而且不需要新增用地,避免了土地赔偿。
Power transmission tower and construction method thereof
The invention relates to the technical field of electric power engineering, in particular to a power transmission tower and a construction method thereof.The power transmission tower is arranged at an old tower position, the old tower position is provided with a plurality of old tower footings, and the old tower footings are horizontally and dispersedly arranged; defining a polygon formed by connecting the centers of the old tower footings clockwise or anticlockwise by a straight line as a first polygon; the power transmission tower comprises a tower body and a plurality of tower foundations which are sequentially arranged from top to bottom, the tower foundations are horizontally and dispersedly arranged, and a polygon formed by connecting the centers of all the old tower foundations clockwise or anticlockwise through a straight line is defined as a second polygon; the second polygons and the first polygons are concentric, and all the vertexes of the first polygons and all the vertexes of the second polygons are alternately arranged at intervals, so that all the tower foundations and all the old tower foundations are horizontally staggered, the tower foundations do not need to be constructed after the old tower foundations are dismantled, the construction period of the power transmission tower is shortened, land does not need to be newly added, and land compensation is avoided.
本发明涉及电力工程技术领域,特别是涉及一种输电塔及其施工方法,本发明的输电塔设置在旧塔位处,旧塔位设有多个旧塔基,各旧塔基水平分散布置;定义以直线沿顺时针或逆时针方向连接各旧塔基的中心所形成的多边形为第一多边形;输电塔包括从上至下依次布置的塔体和塔基础,塔基础水平分散布置有多个,定义以直线沿顺时针或逆时针方向连接各旧塔基的中心所形成的多边形为第二多边形;第二多边形和第一多边形同心且第一多边形的各顶点以及第二多边形的各顶点交替间隔布置,因此各塔基础与各旧塔基水平错开,不需要在拆除旧塔基后再施工塔基础,缩短了输电塔的施工周期,而且不需要新增用地,避免了土地赔偿。
Power transmission tower and construction method thereof
一种输电塔及其施工方法
LI JINGHUI (author) / DENG ZHANHAO (author) / HE YUNXIANG (author) / ZHUANG ZHIXIANG (author) / CHEN TINGJUN (author) / ZHANG DONGHONG (author) / LI MINSHENG (author)
2024-12-31
Patent
Electronic Resource
Chinese
Assembled power transmission tower base structure and construction method thereof
European Patent Office | 2020
|Power transmission line tower foundation protection device and construction method thereof
European Patent Office | 2024
|Power transmission line tower foundation and construction method
European Patent Office | 2023
|SAFETY FOOTPLATE ASSEMBLY FOR POWER TRANSMISSION STEEL TOWER AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2024
|Power transmission line iron tower foundation construction method
European Patent Office | 2023
|