A platform for research: civil engineering, architecture and urbanism
Precast staircase gap plugging device and construction method thereof
The invention discloses a prefabricated staircase gap plugging device and a construction method thereof.The prefabricated staircase gap plugging device comprises a gap shielding panel, the lower end of an upward prefabricated staircase and the upper end of a downward prefabricated staircase are installed on a supporting beam of a staircase, and gaps are formed between the upward prefabricated staircase and the downward prefabricated staircase and between the upward prefabricated staircase and the downward prefabricated staircase and between the upward prefabricated staircase and the downward prefabricated staircase and the beam face of the supporting beam; the seam shielding panel is laid at the lower end of the ascending prefabricated stair and the upper end of the descending prefabricated stair so as to shield a seam opening of the seam; the sealing plate is used for shielding a port of the gap and is connected to one side of the gap shielding panel; and the bottom supporting plate is mounted on the sealing plate in a lifting manner, and the bottom supporting plate is supported at the beam bottom of the supporting beam. The problems that garbage easily enters gaps of an existing prefabricated staircase, and treatment wastes time and labor are solved.
本发明公开了一种预制楼梯间缝隙封堵装置及其施工方法,包括:遮缝面板,上行预制楼梯的下端和下行预制楼梯的上端安装于楼梯间的支承梁上,所述上行预制楼梯与所述下行预制楼梯、所述支承梁的梁面之间形成缝隙,所述遮缝面板铺设于所述上行预制楼梯的下端和所述下行预制楼梯的上端上以遮蔽所述缝隙的缝口;用于遮蔽所述缝隙的端口的封闭板,连接于所述遮缝面板的一侧;托底板,可升降地安装于所述封闭板,所述托底板支撑于所述支承梁的梁底。本发明解决了现有的预制楼梯间缝隙易进入垃圾,处理费时费力的问题。
Precast staircase gap plugging device and construction method thereof
The invention discloses a prefabricated staircase gap plugging device and a construction method thereof.The prefabricated staircase gap plugging device comprises a gap shielding panel, the lower end of an upward prefabricated staircase and the upper end of a downward prefabricated staircase are installed on a supporting beam of a staircase, and gaps are formed between the upward prefabricated staircase and the downward prefabricated staircase and between the upward prefabricated staircase and the downward prefabricated staircase and between the upward prefabricated staircase and the downward prefabricated staircase and the beam face of the supporting beam; the seam shielding panel is laid at the lower end of the ascending prefabricated stair and the upper end of the descending prefabricated stair so as to shield a seam opening of the seam; the sealing plate is used for shielding a port of the gap and is connected to one side of the gap shielding panel; and the bottom supporting plate is mounted on the sealing plate in a lifting manner, and the bottom supporting plate is supported at the beam bottom of the supporting beam. The problems that garbage easily enters gaps of an existing prefabricated staircase, and treatment wastes time and labor are solved.
本发明公开了一种预制楼梯间缝隙封堵装置及其施工方法,包括:遮缝面板,上行预制楼梯的下端和下行预制楼梯的上端安装于楼梯间的支承梁上,所述上行预制楼梯与所述下行预制楼梯、所述支承梁的梁面之间形成缝隙,所述遮缝面板铺设于所述上行预制楼梯的下端和所述下行预制楼梯的上端上以遮蔽所述缝隙的缝口;用于遮蔽所述缝隙的端口的封闭板,连接于所述遮缝面板的一侧;托底板,可升降地安装于所述封闭板,所述托底板支撑于所述支承梁的梁底。本发明解决了现有的预制楼梯间缝隙易进入垃圾,处理费时费力的问题。
Precast staircase gap plugging device and construction method thereof
预制楼梯间缝隙封堵装置及其施工方法
FANG QI (author) / TANG YUANQIANG (author) / NI RUI (author) / LI CHAOFENG (author) / LI JIANXIANG (author) / HONG SHICHENG (author)
2025-01-03
Patent
Electronic Resource
Chinese
STAIRCASE PRECAST CONCRETE STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2025
|Precast column root grouting plugging piece, plugging device and construction method thereof
European Patent Office | 2022
|British Library Online Contents | 2000
Precast wall type damper plugging structure and construction method thereof
European Patent Office | 2024
|