A platform for research: civil engineering, architecture and urbanism
Prefabricated composite floor slab connecting device and connecting method
The invention relates to the technical field of fabricated buildings, in particular to a prefabricated composite floor slab connecting device which comprises a first composite floor slab, a second composite floor slab is arranged on one side of the first composite floor slab, and a limiting rod is connected between the first composite floor slab and the second composite floor slab in an inserted mode; the hoisting mechanism is located at the top of the first composite floor slab and the top of the second composite floor slab and used for conveniently hoisting the first composite floor slab and the second composite floor slab, and the hoisting mechanism comprises a threaded assembly, a closing assembly and a positioning assembly; through the arrangement of the hoisting mechanism, a user can conveniently hoist the spliced first composite floor slab and second composite floor slab, so that the construction time is not delayed in the large-scale construction period, the overall project progress is not easily influenced, the risk of accidents in the construction process is reduced, and the construction efficiency is improved. And meanwhile, the problem that more complex hoisting equipment or tools need to be additionally purchased in order to overcome the defect of inconvenience in hoisting in a traditional device is solved.
本发明涉及装配式建筑技术领域,尤其涉及一种预制叠合楼板连接装置,包括:第一叠合楼板,第一叠合楼板的一侧设置有第二叠合楼板,第一叠合楼板与第二叠合楼板之间插接有限位杆;起吊机构,起吊机构位于第一叠合楼板和第二叠合楼板的顶部且用于方便第一叠合楼板和第二叠合楼板进行起吊,起吊机构包括螺纹组件、闭合组件以及定位组件;起吊机构的设置,能够方便使用者将拼接好后的第一叠合楼板与第二叠合楼板进行起吊,使得在大规模施工期间不会延迟施工时间,不会轻易影响整体的工程进度,降低了施工过程中发生意外事故的风险,同时解决了传统的装置中为了克服起吊不便,需要额外购买更加复杂的吊装设备或工具的问题。
Prefabricated composite floor slab connecting device and connecting method
The invention relates to the technical field of fabricated buildings, in particular to a prefabricated composite floor slab connecting device which comprises a first composite floor slab, a second composite floor slab is arranged on one side of the first composite floor slab, and a limiting rod is connected between the first composite floor slab and the second composite floor slab in an inserted mode; the hoisting mechanism is located at the top of the first composite floor slab and the top of the second composite floor slab and used for conveniently hoisting the first composite floor slab and the second composite floor slab, and the hoisting mechanism comprises a threaded assembly, a closing assembly and a positioning assembly; through the arrangement of the hoisting mechanism, a user can conveniently hoist the spliced first composite floor slab and second composite floor slab, so that the construction time is not delayed in the large-scale construction period, the overall project progress is not easily influenced, the risk of accidents in the construction process is reduced, and the construction efficiency is improved. And meanwhile, the problem that more complex hoisting equipment or tools need to be additionally purchased in order to overcome the defect of inconvenience in hoisting in a traditional device is solved.
本发明涉及装配式建筑技术领域,尤其涉及一种预制叠合楼板连接装置,包括:第一叠合楼板,第一叠合楼板的一侧设置有第二叠合楼板,第一叠合楼板与第二叠合楼板之间插接有限位杆;起吊机构,起吊机构位于第一叠合楼板和第二叠合楼板的顶部且用于方便第一叠合楼板和第二叠合楼板进行起吊,起吊机构包括螺纹组件、闭合组件以及定位组件;起吊机构的设置,能够方便使用者将拼接好后的第一叠合楼板与第二叠合楼板进行起吊,使得在大规模施工期间不会延迟施工时间,不会轻易影响整体的工程进度,降低了施工过程中发生意外事故的风险,同时解决了传统的装置中为了克服起吊不便,需要额外购买更加复杂的吊装设备或工具的问题。
Prefabricated composite floor slab connecting device and connecting method
一种预制叠合楼板连接装置及连接方法
GAO XINHUA (author) / GENG XINGLONG (author) / HOU MINGYANG (author)
2025-01-07
Patent
Electronic Resource
Chinese
Prefabricated composite floor slab connecting device and connecting method
European Patent Office | 2024
|Prefabricated slab and beam steel bar connecting device of composite floor slab
European Patent Office | 2022
|European Patent Office | 2023
|