A platform for research: civil engineering, architecture and urbanism
Bridge construction anti-falling device and using method thereof
The invention discloses a bridge construction anti-falling device and a using method thereof, and relates to the technical field of bridge construction. The bridge construction anti-falling device comprises a supporting device, a lifting device and an anti-falling mechanism, the supporting device comprises a prefabricated concrete block, a supporting steel column, H-shaped steel, first C-shaped steel, second C-shaped steel, a bent supporting plate, a supporting plate, a steel plate and an anti-falling guardrail, the upper surface of the prefabricated concrete block is fixedly connected with a first bolt, and the supporting steel column is arranged at the top of the prefabricated concrete block; the H-shaped steel is arranged at the top end of the supporting steel column, the bottom of the first C-shaped steel is fixedly connected to the upper surface of the H-shaped steel, the top of the second C-shaped steel is fixedly connected to the lower surface of the H-shaped steel, the bent supporting plate is arranged on the lower surface of the second C-shaped steel, and the two ends of the supporting plate are fixedly connected to the bent positions of the lower surface of the bent supporting plate. And third mounting holes are formed in the outer surfaces of the bent supporting plates, so that quick assembly can be realized, and the whole anti-falling device can be conveniently transferred to other construction positions.
本发明公开了一种桥梁施工防落装置及其使用方法,本发明涉及桥梁施工技术领域。该桥梁施工防落装置,包括支撑装置、起吊装置和防落机构,支撑装置包括预制砼块、支撑钢柱、H型钢、第一C型钢、第二C型钢、弯折撑板、支撑板,钢板和防落护栏预制砼块的上表面固定连接有第一螺栓,支撑钢柱设置在预制砼块的顶部,H型钢设置在支撑钢柱的顶端,第一C型钢的底部固定连接在H型钢的上表面,第二C型钢的顶部固定连接在H型钢的下表面,弯折撑板设置在第二C型钢的下表面,支撑板的两端固定连接在弯折撑板下表面的弯折处,弯折撑板的外表面设置有第三安装孔,能够实现快速组装,方便将整个防落装置转移至其他的施工位置。
Bridge construction anti-falling device and using method thereof
The invention discloses a bridge construction anti-falling device and a using method thereof, and relates to the technical field of bridge construction. The bridge construction anti-falling device comprises a supporting device, a lifting device and an anti-falling mechanism, the supporting device comprises a prefabricated concrete block, a supporting steel column, H-shaped steel, first C-shaped steel, second C-shaped steel, a bent supporting plate, a supporting plate, a steel plate and an anti-falling guardrail, the upper surface of the prefabricated concrete block is fixedly connected with a first bolt, and the supporting steel column is arranged at the top of the prefabricated concrete block; the H-shaped steel is arranged at the top end of the supporting steel column, the bottom of the first C-shaped steel is fixedly connected to the upper surface of the H-shaped steel, the top of the second C-shaped steel is fixedly connected to the lower surface of the H-shaped steel, the bent supporting plate is arranged on the lower surface of the second C-shaped steel, and the two ends of the supporting plate are fixedly connected to the bent positions of the lower surface of the bent supporting plate. And third mounting holes are formed in the outer surfaces of the bent supporting plates, so that quick assembly can be realized, and the whole anti-falling device can be conveniently transferred to other construction positions.
本发明公开了一种桥梁施工防落装置及其使用方法,本发明涉及桥梁施工技术领域。该桥梁施工防落装置,包括支撑装置、起吊装置和防落机构,支撑装置包括预制砼块、支撑钢柱、H型钢、第一C型钢、第二C型钢、弯折撑板、支撑板,钢板和防落护栏预制砼块的上表面固定连接有第一螺栓,支撑钢柱设置在预制砼块的顶部,H型钢设置在支撑钢柱的顶端,第一C型钢的底部固定连接在H型钢的上表面,第二C型钢的顶部固定连接在H型钢的下表面,弯折撑板设置在第二C型钢的下表面,支撑板的两端固定连接在弯折撑板下表面的弯折处,弯折撑板的外表面设置有第三安装孔,能够实现快速组装,方便将整个防落装置转移至其他的施工位置。
Bridge construction anti-falling device and using method thereof
一种桥梁施工防落装置及其使用方法
2025-01-17
Patent
Electronic Resource
Chinese