A platform for research: civil engineering, architecture and urbanism
Large-scale double-high-span steel-making plant structure and construction method
The invention relates to the technical field of plant structures, and discloses a large-scale double-high-span steel plant structure and a construction method.The large-scale double-high-span steel plant structure comprises bases and a shed roof, the multiple bases are sequentially arranged on the two sides of the lower portion of the shed roof from front to back, the multiple adjacent bases abut against each other, and supporting plates are fixedly arranged on the two sides of the multiple bases; mounting holes are fixedly formed in the positions, corresponding to the multiple supporting plates, of the lower surfaces of the two sides of the shed roof, supporting rods are inserted into the inner sides of the multiple mounting holes, the lower ends of the multiple supporting rods are fixedly connected with the corresponding supporting plates, first mounting plates are fixedly arranged on the lower surfaces of the two ends of the shed roof, and the first mounting plates are fixedly arranged on the lower surfaces of the two ends of the shed roof. Second mounting plates are fixedly arranged on the upper surfaces of the multiple bases, and wall plates are arranged between the first mounting plate and the multiple second mounting plates in an abutting mode. According to the large-scale double-high-span steel-making plant structure and the construction method, the damaged wallboards can be quickly disassembled and replaced, and the wallboard replacement efficiency can be greatly improved.
本发明涉及厂房结构技术领域,且公开了大型双高跨炼钢厂房结构及建造方法,包括底座和棚顶,多个所述底座分别从前至后依次设置于棚顶的下方两侧,多个相邻的底座均相抵设置,多个所述底座的两侧均固定设置有支撑板,所述棚顶的两侧下表面且与多个所述支撑板对应的位置均固定设置有安装孔,多个所述安装孔的内侧均插接有支撑杆,多个所述支撑杆的下端均与对应的支撑板固定连接,所述棚顶的两端下表面均固定设置有第一安装板,多个所述底座的上表面均固定设置有第二安装板,所述第一安装板与多个所述第二安装板之间均相抵设置有墙板。该大型双高跨炼钢厂房结构及建造方法,能够对损坏的墙板进行快速拆卸更换,能够大大提高墙板更换的效率。
Large-scale double-high-span steel-making plant structure and construction method
The invention relates to the technical field of plant structures, and discloses a large-scale double-high-span steel plant structure and a construction method.The large-scale double-high-span steel plant structure comprises bases and a shed roof, the multiple bases are sequentially arranged on the two sides of the lower portion of the shed roof from front to back, the multiple adjacent bases abut against each other, and supporting plates are fixedly arranged on the two sides of the multiple bases; mounting holes are fixedly formed in the positions, corresponding to the multiple supporting plates, of the lower surfaces of the two sides of the shed roof, supporting rods are inserted into the inner sides of the multiple mounting holes, the lower ends of the multiple supporting rods are fixedly connected with the corresponding supporting plates, first mounting plates are fixedly arranged on the lower surfaces of the two ends of the shed roof, and the first mounting plates are fixedly arranged on the lower surfaces of the two ends of the shed roof. Second mounting plates are fixedly arranged on the upper surfaces of the multiple bases, and wall plates are arranged between the first mounting plate and the multiple second mounting plates in an abutting mode. According to the large-scale double-high-span steel-making plant structure and the construction method, the damaged wallboards can be quickly disassembled and replaced, and the wallboard replacement efficiency can be greatly improved.
本发明涉及厂房结构技术领域,且公开了大型双高跨炼钢厂房结构及建造方法,包括底座和棚顶,多个所述底座分别从前至后依次设置于棚顶的下方两侧,多个相邻的底座均相抵设置,多个所述底座的两侧均固定设置有支撑板,所述棚顶的两侧下表面且与多个所述支撑板对应的位置均固定设置有安装孔,多个所述安装孔的内侧均插接有支撑杆,多个所述支撑杆的下端均与对应的支撑板固定连接,所述棚顶的两端下表面均固定设置有第一安装板,多个所述底座的上表面均固定设置有第二安装板,所述第一安装板与多个所述第二安装板之间均相抵设置有墙板。该大型双高跨炼钢厂房结构及建造方法,能够对损坏的墙板进行快速拆卸更换,能够大大提高墙板更换的效率。
Large-scale double-high-span steel-making plant structure and construction method
大型双高跨炼钢厂房结构及建造方法
YANG HUI (author) / ZHENG ZHIFEI (author) / YIN ZHIXIN (author) / WANG TAIHAO (author)
2025-01-17
Patent
Electronic Resource
Chinese
Large-scale staggered-span continuous-row steel-making plant structure and construction method
European Patent Office | 2025
|