A platform for research: civil engineering, architecture and urbanism
Pollutant barrier wall construction device
The invention discloses a pollutant barrier wall construction device, and belongs to the technical field of barrier wall construction. The device comprises a supporting rack, a conveying pipe assembly and a feeding pipe assembly, wherein the conveying pipe assembly and the feeding pipe assembly are vertically mounted on the supporting rack; the conveying pipe assembly comprises a main conveying pipe and a material collecting pipe, the material collecting pipe is connected to the bottom of the supporting rack, the main conveying pipe is connected to the top of the material collecting pipe, and discharging ports are formed in the pipe wall of the bottom of the main conveying pipe at intervals; the feeding pipe assembly comprises feeding pipes, and the feeding pipes vertically and evenly surround the periphery of the main conveying pipe. The discharging port is alternately communicated with the feeding pipes through a directional conveying assembly, the feeding pipes are communicated with the material collecting pipe, the main conveying pipe is externally connected with a slurry conveying machine through a feeding guide pipe, and the material collecting pipe is externally connected with a blocking bag through a discharging guide pipe. And the discharging port is alternately communicated with the feeding pipes through the directional conveying assembly to discharge materials to the material collecting pipe, alternate circulating continuous grouting is conducted on the blocking bag, and the problem that in the prior art, during blocking wall construction grouting, construction is interrupted, and a cavity is likely to be formed in the blocking bag is solved.
本发明公开了一种污染物阻隔墙施工装置,属于阻隔墙施工技术领域。本发明包括支撑机架、竖向安装于支撑机架上的输送管组件和进料管组件;输送管组件包括主输送管和集料管,集料管连接于支撑机架的底部,主输送管连接于集料管的顶部,主输送管底部管壁间隔设置有出料端口;进料管组件包括进料管,各进料管竖向均匀环绕在主输送管的外围;出料端口通过定向输送组件与各进料管交替连通,各进料管均与集料管连通,主输送管通过进料导管外接输送浆料机,集料管通过排料导管外接阻隔袋。出料端口通过定向输送组件与各进料管交替连通出料至集料管,向阻隔袋交替循环连续灌浆,解决了现有技术阻隔墙施工灌浆时施工间断容易导致阻隔袋内部形成空腔的问题。
Pollutant barrier wall construction device
The invention discloses a pollutant barrier wall construction device, and belongs to the technical field of barrier wall construction. The device comprises a supporting rack, a conveying pipe assembly and a feeding pipe assembly, wherein the conveying pipe assembly and the feeding pipe assembly are vertically mounted on the supporting rack; the conveying pipe assembly comprises a main conveying pipe and a material collecting pipe, the material collecting pipe is connected to the bottom of the supporting rack, the main conveying pipe is connected to the top of the material collecting pipe, and discharging ports are formed in the pipe wall of the bottom of the main conveying pipe at intervals; the feeding pipe assembly comprises feeding pipes, and the feeding pipes vertically and evenly surround the periphery of the main conveying pipe. The discharging port is alternately communicated with the feeding pipes through a directional conveying assembly, the feeding pipes are communicated with the material collecting pipe, the main conveying pipe is externally connected with a slurry conveying machine through a feeding guide pipe, and the material collecting pipe is externally connected with a blocking bag through a discharging guide pipe. And the discharging port is alternately communicated with the feeding pipes through the directional conveying assembly to discharge materials to the material collecting pipe, alternate circulating continuous grouting is conducted on the blocking bag, and the problem that in the prior art, during blocking wall construction grouting, construction is interrupted, and a cavity is likely to be formed in the blocking bag is solved.
本发明公开了一种污染物阻隔墙施工装置,属于阻隔墙施工技术领域。本发明包括支撑机架、竖向安装于支撑机架上的输送管组件和进料管组件;输送管组件包括主输送管和集料管,集料管连接于支撑机架的底部,主输送管连接于集料管的顶部,主输送管底部管壁间隔设置有出料端口;进料管组件包括进料管,各进料管竖向均匀环绕在主输送管的外围;出料端口通过定向输送组件与各进料管交替连通,各进料管均与集料管连通,主输送管通过进料导管外接输送浆料机,集料管通过排料导管外接阻隔袋。出料端口通过定向输送组件与各进料管交替连通出料至集料管,向阻隔袋交替循环连续灌浆,解决了现有技术阻隔墙施工灌浆时施工间断容易导致阻隔袋内部形成空腔的问题。
Pollutant barrier wall construction device
一种污染物阻隔墙施工装置
HUANG JINKUN (author) / KIM IN-JAE (author) / LU XIXIN (author) / DU YANJUN (author) / DING YUNXIAO (author) / CHENG ANCHUN (author) / NAN BO (author) / ZHAO GUOHUI (author) / GONG BAOJU (author) / LIU JUNJUN (author)
2025-01-24
Patent
Electronic Resource
Chinese
Barrier wall construction device and construction method thereof
European Patent Office | 2022
|Pollutant treatment tank vertical diaphragm wall construction pressing frame and construction method
European Patent Office | 2024
|Construction device and construction method of flexible vertical barrier wall
European Patent Office | 2023
|European Patent Office | 2024
|