A platform for research: civil engineering, architecture and urbanism
Construction et procédé de construction.
The unit has a set of construction elements installed on a base, where each element comprises hinge points (1-4) forming multi-directional hinges. The first hinge point is fixed at the base, and the second and third hinge points form a fixing point for an adjacent construction element. The construction elements are connected with each other by the second or third hinge point or by the second and third hinge points. A force transmission element (5) is connected to the fourth hinge point different from the first hinge point and located in a plane. An independent claim is also included for a method for erecting a construction unit.
Construction et procédé de construction.
The unit has a set of construction elements installed on a base, where each element comprises hinge points (1-4) forming multi-directional hinges. The first hinge point is fixed at the base, and the second and third hinge points form a fixing point for an adjacent construction element. The construction elements are connected with each other by the second or third hinge point or by the second and third hinge points. A force transmission element (5) is connected to the fourth hinge point different from the first hinge point and located in a plane. An independent claim is also included for a method for erecting a construction unit.
Construction et procédé de construction.
Construction and construction method
Bau und Bauverfahren.
BUSKES HENRICUS (author)
2018-10-24
Patent
Electronic Resource
French
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2016
|ELEMENTS DE CONSTRUCTION, KIT ET PROCEDE DE CONSTRUCTION CORRESPONDANTS
European Patent Office | 2017
|PROCEDE D'ASSEMBLAGE D'ELEMENTS DE CONSTRUCTION ET CONSTRUCTION AINSI REALISEE
European Patent Office | 2021
|DISPOSITIF DE CONSTRUCTION ET PROCEDE DE CONSTRUCTION UTILISANT CE DISPOSITIF DE CONSTRUCTION
European Patent Office | 2015
|