A platform for research: civil engineering, architecture and urbanism
FLOAT MOORING METHOD, MOORING MEMBER, AND METHOD OF RECOVERING SAME
A mooring method of the present invention includes a transportation step of transporting a mooring member (1) having a mooring cable (10) which can be connected to a float at one end (10a) thereof and an accommodation member (20) which is installed at the other end (10b) of the mooring cable (10) and has an accommodation space (20s) therein to a mooring position of the float, a first accommodation step of accommodating a first heavy weight in at least a part of the accommodation space (20s) of the accommodation member (20) at the mooring position, a connection step of connecting the one end (10a) of the mooring cable (10) to the float at the mooring position after the first accommodation step, and a second accommodation step of accommodating a second heavy weight in the accommodation space (20s) of the accommodation member (20) by adding the second heavy weight to the first heavy weight or exchanging at least part of the first heavy weight with the second heavy weight at the mooring position after the connection step.
FLOAT MOORING METHOD, MOORING MEMBER, AND METHOD OF RECOVERING SAME
A mooring method of the present invention includes a transportation step of transporting a mooring member (1) having a mooring cable (10) which can be connected to a float at one end (10a) thereof and an accommodation member (20) which is installed at the other end (10b) of the mooring cable (10) and has an accommodation space (20s) therein to a mooring position of the float, a first accommodation step of accommodating a first heavy weight in at least a part of the accommodation space (20s) of the accommodation member (20) at the mooring position, a connection step of connecting the one end (10a) of the mooring cable (10) to the float at the mooring position after the first accommodation step, and a second accommodation step of accommodating a second heavy weight in the accommodation space (20s) of the accommodation member (20) by adding the second heavy weight to the first heavy weight or exchanging at least part of the first heavy weight with the second heavy weight at the mooring position after the connection step.
FLOAT MOORING METHOD, MOORING MEMBER, AND METHOD OF RECOVERING SAME
SCHWIMMFAHRZEUGANLEGEVERFAHREN, ANLEGEELEMENT UND VERFAHREN ZUR RÜCKGEWINNUNG DAVON
PROCÉDÉ D'AMARRAGE DE FLOTTEUR, ÉLÉMENT D'AMARRAGE ET PROCÉDÉ DE RÉCUPÉRATION ASSOCIÉ
TORII TADASHI (author) / FUJIWARA KOHICHI (author) / OOKUBO HIROSHI (author) / IWAMOTO CHIKARA (author) / YAMASHITA ATSUSHI (author)
2019-05-29
Patent
Electronic Resource
English
FLOAT MOORING METHOD, MOORING MEMBER, AND METHOD OF RECOVERING SAME
European Patent Office | 2016
|European Patent Office | 2023
|