A platform for research: civil engineering, architecture and urbanism
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
A method has the following steps: a) providing an undersea foundation arranged on the bed of a body of water; b) laying a section of pipe and of an in-line structure on the foundation and allowing the section of pipe to freely self-orient on the foundation; c) placing at least one guide on the foundation on both sides of the section of pipe; d) blocking the guide on the foundation to laterally clamp the section of pipe with respect to the foundation, while authorizing a longitudinal movement of the section of pipe with respect to the guide.
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
A method has the following steps: a) providing an undersea foundation arranged on the bed of a body of water; b) laying a section of pipe and of an in-line structure on the foundation and allowing the section of pipe to freely self-orient on the foundation; c) placing at least one guide on the foundation on both sides of the section of pipe; d) blocking the guide on the foundation to laterally clamp the section of pipe with respect to the foundation, while authorizing a longitudinal movement of the section of pipe with respect to the guide.
PROCÉDÉ DE MISE EN PLACE D'UNE INSTALLATION SOUS-MARINE COMPORTANT AU MOINS UN TRONÇON DE CONDUITE, ET INSTALLATION ASSOCIÉE
METHOD FOR MOUNTING AN UNDERSEA INSTALLATION COMPRISING AT LEAST ONE SECTION OF PIPE, AND ASSOCIATED INSTALLATION
VERFAHREN ZUR MONTAGE EINER UNTERWASSERINSTALLATION MIT MINDESTENS EINEM ROHRABSCHNITT UND ZUGEHÖRIGE INSTALLATION
ROUTEAU SYLVAIN (author)
2019-02-13
Patent
Electronic Resource
French
European Patent Office | 2017
|European Patent Office | 2016
|European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2022
|