A platform for research: civil engineering, architecture and urbanism
Double composite girder (A) for a bridge, the girder having a rectangular container-like steel box (10) adapted to have concrete (C) filled in an interior thereof, a bottom flange (30) located under the steel box (10) in a longitudinal direction of the steel box (10), and a web (20) located between the steel box (10) and the bottom flange (30) to connect the steel box (10) and the bottom flange (30) to each other, wherein a top of the web (20) corresponds to an underside of the steel box (10) and an underside of the web (20) is located longitudinally on the center of top of the bottom flange (30), the double composite girder (A) including: a middle span (100) formed between two adjacent piers or between an abutment and a pier; and support spans (200) formed on points of the piers or abutments in such a manner as to be connected to the middle span (100), wherein the middle span (100) is divided into a first concrete filling section (X) in which the concrete is filled from the arch-shaped bottom to the top flanges and a second concrete filling section (Y) in which the concrete is filled to a given height from the arch-shaped bottom, and the first concrete filling section (X) and the second concrete filling section (Y) of the middle span (100) being partitioned by a blocking plate (140), so that amounts of concrete filled in the first concrete filling section (X) and the second concrete filling section (Y) are different from each other.
Double composite girder (A) for a bridge, the girder having a rectangular container-like steel box (10) adapted to have concrete (C) filled in an interior thereof, a bottom flange (30) located under the steel box (10) in a longitudinal direction of the steel box (10), and a web (20) located between the steel box (10) and the bottom flange (30) to connect the steel box (10) and the bottom flange (30) to each other, wherein a top of the web (20) corresponds to an underside of the steel box (10) and an underside of the web (20) is located longitudinally on the center of top of the bottom flange (30), the double composite girder (A) including: a middle span (100) formed between two adjacent piers or between an abutment and a pier; and support spans (200) formed on points of the piers or abutments in such a manner as to be connected to the middle span (100), wherein the middle span (100) is divided into a first concrete filling section (X) in which the concrete is filled from the arch-shaped bottom to the top flanges and a second concrete filling section (Y) in which the concrete is filled to a given height from the arch-shaped bottom, and the first concrete filling section (X) and the second concrete filling section (Y) of the middle span (100) being partitioned by a blocking plate (140), so that amounts of concrete filled in the first concrete filling section (X) and the second concrete filling section (Y) are different from each other.
DOUBLE COMPOSITE GIRDER FOR BRIDGE
DOPPELVERBUNDTRÄGER FÜR BRÜCKE
POUTRE COMPOSITE DOUBLE DE PONT
WON YONG SEOK (author)
2020-07-29
Patent
Electronic Resource
English
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
European Patent Office | 2019
|DESIGN METHOD FOR SPC COMPOSITE GIRDER BRIDGE AND THE GIRDER BRIDGE
European Patent Office | 2016
|