A platform for research: civil engineering, architecture and urbanism
METHOD OF CONNECTING A TOWER TO A FOUNDATION AND TOWER FOUNDATION ASSEMBLY
A tower foundation assembly (100) includes a foundation (102) having a base section (104) and a receptacle (106) atop the base section (104). The receptacle (106) of the foundation (102) defines a bottom surface (108) and an inner perimeter wall (110). The tower foundation assembly (100) also includes a tower (12), such as a wind turbine tower, secured to the inner perimeter wall (110) within the receptacle (106) of the foundation (102). As such, the tower (12) extends in a longitudinal direction from the foundation (102).
METHOD OF CONNECTING A TOWER TO A FOUNDATION AND TOWER FOUNDATION ASSEMBLY
A tower foundation assembly (100) includes a foundation (102) having a base section (104) and a receptacle (106) atop the base section (104). The receptacle (106) of the foundation (102) defines a bottom surface (108) and an inner perimeter wall (110). The tower foundation assembly (100) also includes a tower (12), such as a wind turbine tower, secured to the inner perimeter wall (110) within the receptacle (106) of the foundation (102). As such, the tower (12) extends in a longitudinal direction from the foundation (102).
METHOD OF CONNECTING A TOWER TO A FOUNDATION AND TOWER FOUNDATION ASSEMBLY
VERFAHREN ZUM VERBINDEN EINES TURMS MIT EINEM FUNDAMENT UND TURMFUNDAMENTAUFBAU
PROCÉDÉ DE CONNEXION D'UNE TOUR À UNE FONDATION ET ASSEMBLAGE DE LA FONDATION D'UNE TOUR
VOSS STEFAN BERNHARD (author)
2022-06-22
Patent
Electronic Resource
English
Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|Method for arranging tower crane foundation and tower crane foundation structure
European Patent Office | 2023
|