A platform for research: civil engineering, architecture and urbanism
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
To ensure a pipe space and an arrangement space for a passage by simply assembling a plant configuring module at a plant construction place without affecting the arrangement of plant elements arranged in the plant configuring module.A plant configuring module is created that includes a frame body having a lower frame member of a rectangular shape, an upper frame member having the same shape as the lower frame member, and a column member that couples the upper frame member and the lower frame member, and a plant element arranged inside the frame body, the column member being formed with a projecting column portion that projects out from one side or both sides of the lower frame member and the upper frame member, and a flange plate for bonding being arranged at a distal end portion of the projecting column portion; the plant configuring modules are stacked by a predetermined number of stages at a plant construction place; two overlapping flange portions of the overlapped plant configuring modules are coupled; and the plant configuring modules adjacent in a horizontal direction are coupled with a connecting beam.
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
To ensure a pipe space and an arrangement space for a passage by simply assembling a plant configuring module at a plant construction place without affecting the arrangement of plant elements arranged in the plant configuring module.A plant configuring module is created that includes a frame body having a lower frame member of a rectangular shape, an upper frame member having the same shape as the lower frame member, and a column member that couples the upper frame member and the lower frame member, and a plant element arranged inside the frame body, the column member being formed with a projecting column portion that projects out from one side or both sides of the lower frame member and the upper frame member, and a flange plate for bonding being arranged at a distal end portion of the projecting column portion; the plant configuring modules are stacked by a predetermined number of stages at a plant construction place; two overlapping flange portions of the overlapped plant configuring modules are coupled; and the plant configuring modules adjacent in a horizontal direction are coupled with a connecting beam.
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
ANLAGENAUSRÜSTUNGKONSTRUKTIONSVERFAHREN UND ANLAGENKONFIGURATIONSMODUL
PROCÉDÉ DE CONSTRUCTION D'ÉQUIPEMENT DE CHANTIER ET MODULE DE CONFIGURATION D'ÉQUIPEMENT DE CHANTIER
IZUMI YOSHITAKA (author)
2023-05-17
Patent
Electronic Resource
English
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
European Patent Office | 2020
|European Patent Office | 2020
|European Patent Office | 2022
|European Patent Office | 2023
|CONSTRUCTION METHOD FOR PLANT FACILITY AND PLANT CONFIGURING MODULE
European Patent Office | 2022
|