PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
[Problem] To make it possible to ensure space for pipes and space for providing passageways simply by assembling plant configuration modules at a plant building site, without affecting the arrangement of plant elements arranged in the plant configuration modules. [Solution] A plant configuration module is created that comprises: a frame that includes a lower frame member which is rectangular, an upper frame member of the same shape as the lower frame member, and a column member which connects the upper frame member and the lower frame member; and a plant element that is disposed inside the frame. The column member has formed thereon a protruding column part which protrudes from either the lower frame member or the upper frame member, or from both. A flange plate for coupling is provided at a tip section of the protruding column part. At a plant construction site, the plant configuration modules are stacked in a predetermined number of levels, two overlapping flange parts of the stacked plant configuration modules are connected, and horizontally adjacent plant configuration modules are connected by a bond beam.
Le problème décrit par la présente invention est de permettre d'assurer un espace pour des tuyaux et un espace pour fournir des passages simplement en assemblant des modules de configuration d'équipement de chantier au niveau d'un site de construction d'équipement de chantier, sans affecter l'agencement d'éléments d'équipement de chantier agencés dans les modules de configuration d'équipement de chantier. La solution selon l'invention porte sur un module de configuration d'équipement de chantier qui comprend : un cadre qui comprend un élément de cadre inférieur qui est rectangulaire, un élément de cadre supérieur ayant la même forme que l'élément de cadre inférieur, et un élément de colonne qui relie l'élément de cadre supérieur et l'élément de cadre inférieur ; et un élément d'équipement de chantier qui est disposé à l'intérieur du cadre. Une partie de colonne en saillie est formé sur l'élément de colonne, et fait saillie à partir de l'élément de cadre inférieur ou de l'élément de cadre supérieur, ou à partir des deux. Une plaque de bride pour accouplement est disposée au niveau d'une section de pointe de la partie de colonne en saillie. Au niveau d'un site de construction d'équipement de chantier, les modules de configuration d'équipement de chantier sont empilés dans un nombre prédéterminé de niveaux, deux parties de bride de chevauchement des modules de configuration d'équipement de chantier empilés sont connectées, et des modules de configuration d'équipement de chantier adjacents horizontalement sont reliés par une poutre de liaison.
【課題】プラント構成モジュール内に配置するプラント要素の配置に影響を与えることなく、プラント構成モジュールをプラント建設個所で組み立てるだけでパイプスペースや通路の配置空間を確保可能とする。 【解決手段】矩形をなす下側枠部材、下側枠部材と同形の上側枠部材、及び上側枠部材と下側枠部材を連結する柱部材を備える枠体と、枠体の内部に配置されたプラント要素とを備え、柱部材には下側枠部材及び上側枠部材の一方側又は両方側から突出する突出柱部が形成され、突出柱部の先端部に結合用のフランジ板を備えるプラント構成モジュールを作成し、プラント施工個所において、プラント構成モジュールを所定の段数だけ積み重ね、重ねたプラント構成モジュールの重なった2枚のフランジ部を連結し、水平方法に隣接するプラント構成モジュールを接合梁材で連結する。
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
[Problem] To make it possible to ensure space for pipes and space for providing passageways simply by assembling plant configuration modules at a plant building site, without affecting the arrangement of plant elements arranged in the plant configuration modules. [Solution] A plant configuration module is created that comprises: a frame that includes a lower frame member which is rectangular, an upper frame member of the same shape as the lower frame member, and a column member which connects the upper frame member and the lower frame member; and a plant element that is disposed inside the frame. The column member has formed thereon a protruding column part which protrudes from either the lower frame member or the upper frame member, or from both. A flange plate for coupling is provided at a tip section of the protruding column part. At a plant construction site, the plant configuration modules are stacked in a predetermined number of levels, two overlapping flange parts of the stacked plant configuration modules are connected, and horizontally adjacent plant configuration modules are connected by a bond beam.
Le problème décrit par la présente invention est de permettre d'assurer un espace pour des tuyaux et un espace pour fournir des passages simplement en assemblant des modules de configuration d'équipement de chantier au niveau d'un site de construction d'équipement de chantier, sans affecter l'agencement d'éléments d'équipement de chantier agencés dans les modules de configuration d'équipement de chantier. La solution selon l'invention porte sur un module de configuration d'équipement de chantier qui comprend : un cadre qui comprend un élément de cadre inférieur qui est rectangulaire, un élément de cadre supérieur ayant la même forme que l'élément de cadre inférieur, et un élément de colonne qui relie l'élément de cadre supérieur et l'élément de cadre inférieur ; et un élément d'équipement de chantier qui est disposé à l'intérieur du cadre. Une partie de colonne en saillie est formé sur l'élément de colonne, et fait saillie à partir de l'élément de cadre inférieur ou de l'élément de cadre supérieur, ou à partir des deux. Une plaque de bride pour accouplement est disposée au niveau d'une section de pointe de la partie de colonne en saillie. Au niveau d'un site de construction d'équipement de chantier, les modules de configuration d'équipement de chantier sont empilés dans un nombre prédéterminé de niveaux, deux parties de bride de chevauchement des modules de configuration d'équipement de chantier empilés sont connectées, et des modules de configuration d'équipement de chantier adjacents horizontalement sont reliés par une poutre de liaison.
【課題】プラント構成モジュール内に配置するプラント要素の配置に影響を与えることなく、プラント構成モジュールをプラント建設個所で組み立てるだけでパイプスペースや通路の配置空間を確保可能とする。 【解決手段】矩形をなす下側枠部材、下側枠部材と同形の上側枠部材、及び上側枠部材と下側枠部材を連結する柱部材を備える枠体と、枠体の内部に配置されたプラント要素とを備え、柱部材には下側枠部材及び上側枠部材の一方側又は両方側から突出する突出柱部が形成され、突出柱部の先端部に結合用のフランジ板を備えるプラント構成モジュールを作成し、プラント施工個所において、プラント構成モジュールを所定の段数だけ積み重ね、重ねたプラント構成モジュールの重なった2枚のフランジ部を連結し、水平方法に隣接するプラント構成モジュールを接合梁材で連結する。
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
PROCÉDÉ DE CONSTRUCTION D'ÉQUIPEMENT DE CHANTIER ET MODULE DE CONFIGURATION D'ÉQUIPEMENT DE CHANTIER
プラント設備の施工方法及びプラント構成モジュール
IZUMI YOSHITAKA (author)
2020-12-03
Patent
Electronic Resource
Japanese
PLANT EQUIPMENT CONSTRUCTION METHOD AND PLANT CONFIGURATION MODULE
European Patent Office | 2023
|European Patent Office | 2020
|European Patent Office | 2022
|European Patent Office | 2023
|CONSTRUCTION METHOD FOR PLANT FACILITY AND PLANT CONFIGURING MODULE
European Patent Office | 2022
|