A platform for research: civil engineering, architecture and urbanism
VERFAHREN ZUR ERSTELLUNG EINER STRUKTUR EINER TOPOLOGIE EINER DEFINIERT BEGRENZTEN FLÄCHE ZU DEREN ENTWÄSSERUNG
The invention relates to a method for determining a topology of a defined, bounded surface (1) for dewatering said surface by means of at least one specified dewatering point (21), so that the surface (1) comprises a monotonically increasing slope starting from the dewatering point (21) to a collision point (16), said method avoiding the disadvantages of eth prior art and determining in a more efficient, simple, and less error-prone manner a topology of a defined, bounded area (1) for dewatering the same by means of at least one specified dewatering point (21), so that the surface (1) comprises a monotonically increasing slope, starting from the dewatering point (21) to a collision point (16), and proposes that the topology is determined such that the surface (1) is subdivided into individual surface elements (2) each having at least one plane (3), wherein a slope in a first direction and/or a second direction perpendicular to the first direction is successively determined in every plane (3) for each area element (2), starting from the dewatering point (21).
VERFAHREN ZUR ERSTELLUNG EINER STRUKTUR EINER TOPOLOGIE EINER DEFINIERT BEGRENZTEN FLÄCHE ZU DEREN ENTWÄSSERUNG
The invention relates to a method for determining a topology of a defined, bounded surface (1) for dewatering said surface by means of at least one specified dewatering point (21), so that the surface (1) comprises a monotonically increasing slope starting from the dewatering point (21) to a collision point (16), said method avoiding the disadvantages of eth prior art and determining in a more efficient, simple, and less error-prone manner a topology of a defined, bounded area (1) for dewatering the same by means of at least one specified dewatering point (21), so that the surface (1) comprises a monotonically increasing slope, starting from the dewatering point (21) to a collision point (16), and proposes that the topology is determined such that the surface (1) is subdivided into individual surface elements (2) each having at least one plane (3), wherein a slope in a first direction and/or a second direction perpendicular to the first direction is successively determined in every plane (3) for each area element (2), starting from the dewatering point (21).
VERFAHREN ZUR ERSTELLUNG EINER STRUKTUR EINER TOPOLOGIE EINER DEFINIERT BEGRENZTEN FLÄCHE ZU DEREN ENTWÄSSERUNG
METHOD FOR ESTABLISHING A STRUCTURE OF A TOPOLOGY OF A DEFINED LIMITED AREA FOR DRAINAGE OF SAME
PROCÉDÉ POUR ÉTABLIR UNE STRUCTURE D'UNE TOPOLOGIE D'UNE SURFACE DÉLIMITÉE DE MANIÈRE DÉFINIE AUX FINS DE SON DRAINAGE
BÖRNCHEN ROMAN (author) / ROEDER MITJA (author)
2024-01-17
Patent
Electronic Resource
German
VERFAHREN ZUR FESTLEGUNG EINER TOPOLOGIE EINER DEFINIERT BEGRENZTEN FLÄCHE ZU DEREN ENTWÄSSERUNG
European Patent Office | 2021
|European Patent Office | 2025
|REINIGUNGSVORRICHTUNG SOWIE VERFAHREN ZUM REINIGEN EINER FLÄCHE
European Patent Office | 2019
|