A platform for research: civil engineering, architecture and urbanism
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
The invention refers to a drywall, especially a shaft dry way, having a rear side and a front side. The drywall comprises a first cladding (4) and a second cladding (5), and each cladding comprises one or more drywall panel layers. Each on two opposing boundaries (7, 8) a runner (3) comprising one or more runner elements is provided, each runner (3) having a rear section (35), essentially extending in a first plane, and a front section (36), essentially extending in a second plane, and wherein both runners 3 are arranged essentially parallel to each other. A plurality of first construction means (1 ), each first construction means (1 ) having a rear section (1 1 ), essentially extending in a first plane, and a front section (12), essentially extending in a second plane, is fixed to the rear section (35) of the runners (3) by their own rear sections (1 1 ). The first cladding (4) is fixed to the front sections (12) of the first construction means (1 ). A plurality of second construction means (2) are provided, each second construction means (2) has a rear section (21 ) and a front section (22), and the second construction means (2) is positioned between the first cladding (4) and the front section (36) of the runners (3). The second cladding (5) is fixed to the front sections (22) of the second construction means (2). The invention further refers to a process for erecting a respective drywall, comprising the following steps: (a) attaching a runner (3) each to both of two opposing boundary surfaces (7,8), wherein each runner (3) has a rear section (35) and a front section (35), (b) attaching a plurality of first construction means (1 ), which each have a rear section (1 1 ) and a front section (12), with their rear sections (1 1 ) to rear sections (35) of the two runners (3), (c) attaching at least one panel layer to the front sections (12) of the first construction means (1 ) to build a first cladding (4), (d) positioning a plurality of second fixations means (2), which each have a rear section (21 ) and a front section (22), between the first cladding (4) and front sections (36) of the two runners (3), (e) attaching at least one panel layer (51 ) to the front sections (22) of the second construction means (2) to build a second cladding (5).
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
The invention refers to a drywall, especially a shaft dry way, having a rear side and a front side. The drywall comprises a first cladding (4) and a second cladding (5), and each cladding comprises one or more drywall panel layers. Each on two opposing boundaries (7, 8) a runner (3) comprising one or more runner elements is provided, each runner (3) having a rear section (35), essentially extending in a first plane, and a front section (36), essentially extending in a second plane, and wherein both runners 3 are arranged essentially parallel to each other. A plurality of first construction means (1 ), each first construction means (1 ) having a rear section (1 1 ), essentially extending in a first plane, and a front section (12), essentially extending in a second plane, is fixed to the rear section (35) of the runners (3) by their own rear sections (1 1 ). The first cladding (4) is fixed to the front sections (12) of the first construction means (1 ). A plurality of second construction means (2) are provided, each second construction means (2) has a rear section (21 ) and a front section (22), and the second construction means (2) is positioned between the first cladding (4) and the front section (36) of the runners (3). The second cladding (5) is fixed to the front sections (22) of the second construction means (2). The invention further refers to a process for erecting a respective drywall, comprising the following steps: (a) attaching a runner (3) each to both of two opposing boundary surfaces (7,8), wherein each runner (3) has a rear section (35) and a front section (35), (b) attaching a plurality of first construction means (1 ), which each have a rear section (1 1 ) and a front section (12), with their rear sections (1 1 ) to rear sections (35) of the two runners (3), (c) attaching at least one panel layer to the front sections (12) of the first construction means (1 ) to build a first cladding (4), (d) positioning a plurality of second fixations means (2), which each have a rear section (21 ) and a front section (22), between the first cladding (4) and front sections (36) of the two runners (3), (e) attaching at least one panel layer (51 ) to the front sections (22) of the second construction means (2) to build a second cladding (5).
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
TROCKENBAUWANDSYSTEM UND VERFAHREN ZUR ERRICHTUNG EINER TROCKENBAUWAND
SYSTÈME DE CLOISON SÈCHE ET PROCÉDÉ POUR ÉRIGER UNE CLOISON SÈCHE
WRONSKI MICHAEL (author)
2024-08-07
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS