A platform for research: civil engineering, architecture and urbanism
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
The invention refers to a drywall, especially a shaft dry way, having a rear side and a front side. The drywall comprises a first cladding (4) and a second cladding (5), and each cladding comprises one or more drywall panel layers. Each on two opposing boundaries (7, 8) a runner (3) comprising one or more runner elements is provided, each runner (3) having a rear section (35), essentially extending in a first plane, and a front section (36), essentially extending in a second plane, and wherein both runners 3 are arranged essentially parallel to each other. A plurality of first construction means (1 ), each first construction means (1 ) having a rear section (1 1 ), essentially extending in a first plane, and a front section (12), essentially extending in a second plane, is fixed to the rear section (35) of the runners (3) by their own rear sections (1 1 ). The first cladding (4) is fixed to the front sections (12) of the first construction means (1 ). A plurality of second construction means (2) are provided, each second construction means (2) has a rear section (21 ) and a front section (22), and the second construction means (2) is positioned between the first cladding (4) and the front section (36) of the runners (3). The second cladding (5) is fixed to the front sections (22) of the second construction means (2). The invention further refers to a process for erecting a respective drywall, comprising the following steps: (a) attaching a runner (3) each to both of two opposing boundary surfaces (7,8), wherein each runner (3) has a rear section (35) and a front section (35), (b) attaching a plurality of first construction means (1 ), which each have a rear section (1 1 ) and a front section (12), with their rear sections (1 1 ) to rear sections (35) of the two runners (3), (c) attaching at least one panel layer to the front sections (12) of the first construction means (1 ) to build a first cladding (4), (d) positioning a plurality of second fixations means (2), which each have a rear section (21 ) and a front section (22), between the first cladding (4) and front sections (36) of the two runners (3), (e) attaching at least one panel layer (51 ) to the front sections (22) of the second construction means (2) to build a second cladding (5).
L'invention concerne une cloison sèche, en particulier une cloison sèche à puits, ayant un côté arrière et un côté avant. La cloison sèche comprend une première gaine (4) et une seconde gaine (5), et chaque gaine comprend une ou plusieurs couches de panneau de cloison sèche, chacune sur deux limites opposées (7, 8) ; un coulisseau (3) est prévu, lequel comprend un ou plusieurs éléments coulisseaux, chaque coulisseau (3) ayant une section arrière (35), s'étendant essentiellement dans un premier plan, et une section avant (36), s'étendant essentiellement dans un second plan, et les deux coulisseaux (3) étant agencés sensiblement parallèlement l'un à l'autre ; une pluralité de premiers moyens de construction (1), chaque premier moyen de construction (1) ayant une section arrière (11), s'étendant essentiellement dans un premier plan, et une section avant (12), s'étendant essentiellement dans un second plan, est fixée à la section arrière (35) des coulisseaux (3) par leurs propres sections arrière (11). La première gaine (4) est fixée aux sections avant (12) du premier moyen de construction (1). Une pluralité de seconds moyens de construction (2) sont prévus, chaque second moyen de construction (2) présente une section arrière (21) et une section avant (22), et le second moyen de construction (2) est positionné entre la première gaine (4) et la section avant (36) des coulisseaux (3). La seconde gaine (5) est fixée aux sections avant (22) du second moyen de construction (2). L'invention concerne en outre un procédé pour ériger une cloison sèche respective, comprenant les étapes suivantes consistant à : (a) fixer un coulisseau (3) à chacune des deux surfaces limites opposées (7, 8), chaque coulisseau (3) ayant une section arrière (35) et une section avant (35), (b) fixer une pluralité de premiers moyens de construction (1), qui ont chacun une section arrière (11) et une section avant (12), leurs sections arrière (11) étant fixées à des sections arrière (35) des deux coulisseaux (3), (c) fixer au moins une couche de panneau aux sections avant (12) du premier moyen de construction (1) pour construire une première gaine (4), (d) positionner une pluralité de seconds moyens de fixation (2), qui ont chacun une section arrière (21) et une section avant (22), entre la première gaine (4) et des sections avant (36) des deux coulisseaux (3), (e) fixer au moins une couche de panneau (51) aux sections avant (22) du second moyen de construction (2) pour construire une seconde gaine (5).
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
The invention refers to a drywall, especially a shaft dry way, having a rear side and a front side. The drywall comprises a first cladding (4) and a second cladding (5), and each cladding comprises one or more drywall panel layers. Each on two opposing boundaries (7, 8) a runner (3) comprising one or more runner elements is provided, each runner (3) having a rear section (35), essentially extending in a first plane, and a front section (36), essentially extending in a second plane, and wherein both runners 3 are arranged essentially parallel to each other. A plurality of first construction means (1 ), each first construction means (1 ) having a rear section (1 1 ), essentially extending in a first plane, and a front section (12), essentially extending in a second plane, is fixed to the rear section (35) of the runners (3) by their own rear sections (1 1 ). The first cladding (4) is fixed to the front sections (12) of the first construction means (1 ). A plurality of second construction means (2) are provided, each second construction means (2) has a rear section (21 ) and a front section (22), and the second construction means (2) is positioned between the first cladding (4) and the front section (36) of the runners (3). The second cladding (5) is fixed to the front sections (22) of the second construction means (2). The invention further refers to a process for erecting a respective drywall, comprising the following steps: (a) attaching a runner (3) each to both of two opposing boundary surfaces (7,8), wherein each runner (3) has a rear section (35) and a front section (35), (b) attaching a plurality of first construction means (1 ), which each have a rear section (1 1 ) and a front section (12), with their rear sections (1 1 ) to rear sections (35) of the two runners (3), (c) attaching at least one panel layer to the front sections (12) of the first construction means (1 ) to build a first cladding (4), (d) positioning a plurality of second fixations means (2), which each have a rear section (21 ) and a front section (22), between the first cladding (4) and front sections (36) of the two runners (3), (e) attaching at least one panel layer (51 ) to the front sections (22) of the second construction means (2) to build a second cladding (5).
L'invention concerne une cloison sèche, en particulier une cloison sèche à puits, ayant un côté arrière et un côté avant. La cloison sèche comprend une première gaine (4) et une seconde gaine (5), et chaque gaine comprend une ou plusieurs couches de panneau de cloison sèche, chacune sur deux limites opposées (7, 8) ; un coulisseau (3) est prévu, lequel comprend un ou plusieurs éléments coulisseaux, chaque coulisseau (3) ayant une section arrière (35), s'étendant essentiellement dans un premier plan, et une section avant (36), s'étendant essentiellement dans un second plan, et les deux coulisseaux (3) étant agencés sensiblement parallèlement l'un à l'autre ; une pluralité de premiers moyens de construction (1), chaque premier moyen de construction (1) ayant une section arrière (11), s'étendant essentiellement dans un premier plan, et une section avant (12), s'étendant essentiellement dans un second plan, est fixée à la section arrière (35) des coulisseaux (3) par leurs propres sections arrière (11). La première gaine (4) est fixée aux sections avant (12) du premier moyen de construction (1). Une pluralité de seconds moyens de construction (2) sont prévus, chaque second moyen de construction (2) présente une section arrière (21) et une section avant (22), et le second moyen de construction (2) est positionné entre la première gaine (4) et la section avant (36) des coulisseaux (3). La seconde gaine (5) est fixée aux sections avant (22) du second moyen de construction (2). L'invention concerne en outre un procédé pour ériger une cloison sèche respective, comprenant les étapes suivantes consistant à : (a) fixer un coulisseau (3) à chacune des deux surfaces limites opposées (7, 8), chaque coulisseau (3) ayant une section arrière (35) et une section avant (35), (b) fixer une pluralité de premiers moyens de construction (1), qui ont chacun une section arrière (11) et une section avant (12), leurs sections arrière (11) étant fixées à des sections arrière (35) des deux coulisseaux (3), (c) fixer au moins une couche de panneau aux sections avant (12) du premier moyen de construction (1) pour construire une première gaine (4), (d) positionner une pluralité de seconds moyens de fixation (2), qui ont chacun une section arrière (21) et une section avant (22), entre la première gaine (4) et des sections avant (36) des deux coulisseaux (3), (e) fixer au moins une couche de panneau (51) aux sections avant (22) du second moyen de construction (2) pour construire une seconde gaine (5).
DRYWALL SYSTEM AND PROCESS TO ERECT A DRYWALL
SYSTÈME DE CLOISON SÈCHE ET PROCÉDÉ POUR ÉRIGER UNE CLOISON SÈCHE
WRONSKI MICHAEL (author)
2024-06-27
Patent
Electronic Resource
English
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS