PROCEDIMIENTO DE EJECUCION DE PAVIMENTO CONTINUO
Procedure of execution of continuous pavement configured through two clearly differentiated materials, a concrete made in plant with very specific dosage; and a cement micro-concrete elaborated in-situ of finishing especially developed, with specific dosage of natural aggregates, cements and selected additives. After putting the first material into operation, and when it reaches the optimum degree of plasticity, the finished micro-concrete is applied, which, once it has been tightened, is added deactivating according to the granulometry of the aggregate, and subsequently the fine layer deactivated leaving the aggregate uncovered obtaining an aggregate finish seen. Optionally, the last process of addiction of deactivating and cleaning can be changed by a mechanical cutting after 28 days, leaving a finish of cut aggregate, making in both cases the corresponding sawing of joints. (Machine-translation by Google Translate, not legally binding)
Procedimiento de ejecución de pavimento continuo configurado a través de dos materiales claramente diferenciados, un hormigón elaborado en planta con dosificación muy específica; y un micro-hormigón cementoso elaborado in-situm de acabado especialmente desarrollado, con dosificación especifica de áridos naturales, cementos y aditivos seleccionados. Tras la puesta en obra del primer material, y cuando éste alcanza el grado óptimo de plasticidad, se aplica el micro-hormigón de acabado, al cual, una vez fratasado, se adiciona desactivante acorde a la granulometría del árido, y posteriormente se retira la capa de finos desactivada dejando el árido descubierto obteniendo una terminación de árido visto. Opcionalmente, se puede cambiar el último proceso de adicción de desactivante y limpieza por un tallado mecánico transcurrido 28 días, dejando un acabado de árido tallado, haciendo en los dos casos el aserrado de juntas correspondiente.
PROCEDIMIENTO DE EJECUCION DE PAVIMENTO CONTINUO
Procedure of execution of continuous pavement configured through two clearly differentiated materials, a concrete made in plant with very specific dosage; and a cement micro-concrete elaborated in-situ of finishing especially developed, with specific dosage of natural aggregates, cements and selected additives. After putting the first material into operation, and when it reaches the optimum degree of plasticity, the finished micro-concrete is applied, which, once it has been tightened, is added deactivating according to the granulometry of the aggregate, and subsequently the fine layer deactivated leaving the aggregate uncovered obtaining an aggregate finish seen. Optionally, the last process of addiction of deactivating and cleaning can be changed by a mechanical cutting after 28 days, leaving a finish of cut aggregate, making in both cases the corresponding sawing of joints. (Machine-translation by Google Translate, not legally binding)
Procedimiento de ejecución de pavimento continuo configurado a través de dos materiales claramente diferenciados, un hormigón elaborado en planta con dosificación muy específica; y un micro-hormigón cementoso elaborado in-situm de acabado especialmente desarrollado, con dosificación especifica de áridos naturales, cementos y aditivos seleccionados. Tras la puesta en obra del primer material, y cuando éste alcanza el grado óptimo de plasticidad, se aplica el micro-hormigón de acabado, al cual, una vez fratasado, se adiciona desactivante acorde a la granulometría del árido, y posteriormente se retira la capa de finos desactivada dejando el árido descubierto obteniendo una terminación de árido visto. Opcionalmente, se puede cambiar el último proceso de adicción de desactivante y limpieza por un tallado mecánico transcurrido 28 días, dejando un acabado de árido tallado, haciendo en los dos casos el aserrado de juntas correspondiente.
PROCEDIMIENTO DE EJECUCION DE PAVIMENTO CONTINUO
Procedure for the execution of continuous pavement (Machine-translation by Google Translate, not legally binding)
DE OLIVEIRA PIRES MANUEL (author)
2017-09-04
Patent
Electronic Resource
Spanish
Sistema de pavimento con geoceldas y geomallas y procedimiento para instalar un sistema de pavimento
European Patent Office | 2018
|Procedimiento de construcción de pavimentos, y pavimento resultante
European Patent Office | 2017
|European Patent Office | 2021
|Procedimiento de construcción de pavimentos, y pavimento resultante
European Patent Office | 2016
|