A platform for research: civil engineering, architecture and urbanism
Procedimiento para el montaje de un aerogenerador y aerogenerador
The invention relates to a method for building wind generating equipment (10) with a tower (20) and a nacelle (40) arranged on a spire. Firstly, a tower body structure (24) formed by a plurality of tower sections is constructed. After a termination height of the tower body structure is reached, the nacelle is mounted on the tip of the tower body structure and is rotatably connected with the tower body structure. The invention also relates to corresponding wind generating equipment. According to the invention, at least one vibration damper (50, 60, 70, 70') are arranged in the tower section arranged the last when the tower body structure is built. The natural frequency of the vibration damper is adaptive to a first vibration base frequency of the tower body structure without the nacelle placed, wherein at least one of the vibration dampers remains in the tower after the nacelle is placed on the tower body structure, and the natural frequency of the at least one vibration damper is adaptive to a second vibration base frequency of the completed wind generating equipment.
Procedimiento para el montaje de un aerogenerador y aerogenerador
The invention relates to a method for building wind generating equipment (10) with a tower (20) and a nacelle (40) arranged on a spire. Firstly, a tower body structure (24) formed by a plurality of tower sections is constructed. After a termination height of the tower body structure is reached, the nacelle is mounted on the tip of the tower body structure and is rotatably connected with the tower body structure. The invention also relates to corresponding wind generating equipment. According to the invention, at least one vibration damper (50, 60, 70, 70') are arranged in the tower section arranged the last when the tower body structure is built. The natural frequency of the vibration damper is adaptive to a first vibration base frequency of the tower body structure without the nacelle placed, wherein at least one of the vibration dampers remains in the tower after the nacelle is placed on the tower body structure, and the natural frequency of the at least one vibration damper is adaptive to a second vibration base frequency of the completed wind generating equipment.
Procedimiento para el montaje de un aerogenerador y aerogenerador
SEIDEL MARC (author)
2022-05-13
Patent
Electronic Resource
Spanish
Procedimiento de montaje de un aerogenerador y aerogenerador montado según dicho procedimiento
European Patent Office | 2019
|Procedimiento para erigir un aerogenerador y aerogenerador
European Patent Office | 2016
|European Patent Office | 2024
|Aerogenerador con torre de hormigón y procedimiento para el montaje del mismo
European Patent Office | 2022
|European Patent Office | 2015
|