A platform for research: civil engineering, architecture and urbanism
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with one and the same crane jib configuration, wherein the length (l4,l4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (l5,l5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with one and the same crane jib configuration, wherein the length (l4,l4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (l5,l5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
SERNA GARCIA-CONDE JOSÉ SALUSTIANO (author)
2024-04-16
Patent
Electronic Resource
Spanish
PROCEDIMIENTO DE INSTALACIÓN DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
European Patent Office | 2023
|PROCEDIMIENTO DE INSTALACION DE UN AEROGENERADOR DE TORRE MAR ADENTRO
European Patent Office | 2021
|PROCEDIMIENTO DE INSTALACIÓN DE UN AEROGENERADOR DE TORRE MAR ADENTRO
European Patent Office | 2020
|Procedimiento para erigir una torre así como instalación de energía eólica
European Patent Office | 2020
|