Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with one and the same crane jib configuration, wherein the length (l4,l4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (l5,l5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
The present invention relates to a method for installing or mounting a tower (1) formed by the stacking of two or more mounting groups (2, 2') on a base section (3), wherein at least one of said mounting groups (2, 2') is formed by a plurality of stacked segments (4, 5, 4', 5'). Said method comprises: arranging the base section (3) in the definitive position thereof on the ground; and lifting and placing the mounting groups (2, 2') of the tower (1) on the base section (3) by means of a mounting crane that can adopt different jib configurations. Advantageously, in said method at least two or more stacked segments (4, 5, 4', 5') are installed consecutively in the corresponding mounting group (2, 2') with one and the same crane jib configuration, wherein the length (l4,l4') of the lowest stacked segment (4, 4') of said mounting group (2, 2') is smaller than the length (l5,l5') of at least another stacked segment (5, 5') of the aforementioned mounting group (2, 2').
PROCEDIMIENTO DE INSTALACION DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
SERNA GARCIA-CONDE JOSÉ SALUSTIANO (Autor:in)
16.04.2024
Patent
Elektronische Ressource
Spanisch
PROCEDIMIENTO DE INSTALACIÓN DE UNA TORRE Y TORRE INSTALADA CON DICHO PROCEDIMIENTO
Europäisches Patentamt | 2023
|PROCEDIMIENTO DE INSTALACION DE UN AEROGENERADOR DE TORRE MAR ADENTRO
Europäisches Patentamt | 2021
|PROCEDIMIENTO DE INSTALACIÓN DE UN AEROGENERADOR DE TORRE MAR ADENTRO
Europäisches Patentamt | 2020
|Procedimiento para erigir una torre así como instalación de energía eólica
Europäisches Patentamt | 2020
|