A platform for research: civil engineering, architecture and urbanism
WATER MANAGEMENT SYSTEM, WATER MANAGEMENT METHOD, PROGRAM, AND SERVER
PROBLEM TO BE SOLVED: To provide a water management system intended for stable supply of water.SOLUTION: A water management system manages a water infrastructure equipped with a plurality of water receiving tanks which pool the water supplied from a water distribution system. The water management system includes a prediction part, a calculation part, and a control part. The prediction part predicts water demand of a plurality of consumers distributed from the plurality of water receiving tanks. The calculation part calculates scheduled water supply time for each water receiving tank based on the predicted water demand. The control part supplies water from the water distribution system to the plurality of water receiving tanks on a schedule based on the scheduled water supply time for each water receiving tank. Further, the control part shifts water supply time between the water receiving tanks for which the scheduled water supply times overlap in a case where the scheduled water supply time overlap among two or more water receiving tanks.
【課題】水の安定供給を図った水管理システムを提供すること。【解決手段】実施形態によれば、水管理システムは、配水系統から供給された水をプールする複数の受水槽を備える水インフラを管理する。この水管理システムは、予測部、計算部および制御部を具備する。予測部は、複数の受水槽から配水される複数の需要家の水デマンドを予測する。計算部は、予測された水デマンドに基づいて受水槽毎の給水予定時刻を計算する。制御部は、受水槽毎の給水予定時刻に基づくスケジュールで複数の受水槽に配水系統から給水する。さらに、制御部は、給水予定時刻が2つ以上の受水槽間で重なれば、当該給水予定時刻の重なりあう受水槽間で給水時刻をずらす。【選択図】図4
WATER MANAGEMENT SYSTEM, WATER MANAGEMENT METHOD, PROGRAM, AND SERVER
PROBLEM TO BE SOLVED: To provide a water management system intended for stable supply of water.SOLUTION: A water management system manages a water infrastructure equipped with a plurality of water receiving tanks which pool the water supplied from a water distribution system. The water management system includes a prediction part, a calculation part, and a control part. The prediction part predicts water demand of a plurality of consumers distributed from the plurality of water receiving tanks. The calculation part calculates scheduled water supply time for each water receiving tank based on the predicted water demand. The control part supplies water from the water distribution system to the plurality of water receiving tanks on a schedule based on the scheduled water supply time for each water receiving tank. Further, the control part shifts water supply time between the water receiving tanks for which the scheduled water supply times overlap in a case where the scheduled water supply time overlap among two or more water receiving tanks.
【課題】水の安定供給を図った水管理システムを提供すること。【解決手段】実施形態によれば、水管理システムは、配水系統から供給された水をプールする複数の受水槽を備える水インフラを管理する。この水管理システムは、予測部、計算部および制御部を具備する。予測部は、複数の受水槽から配水される複数の需要家の水デマンドを予測する。計算部は、予測された水デマンドに基づいて受水槽毎の給水予定時刻を計算する。制御部は、受水槽毎の給水予定時刻に基づくスケジュールで複数の受水槽に配水系統から給水する。さらに、制御部は、給水予定時刻が2つ以上の受水槽間で重なれば、当該給水予定時刻の重なりあう受水槽間で給水時刻をずらす。【選択図】図4
WATER MANAGEMENT SYSTEM, WATER MANAGEMENT METHOD, PROGRAM, AND SERVER
水管理システム、水管理方法、プログラムおよびサーバ
WAKAYAMA KOSUKE (author) / YUGAWA ATSUSHI (author) / KOBAYASHI YOSHITAKA (author) / KOBAYASHI HISASHI (author) / KOMIZO TOMOKO (author)
2015-05-28
Patent
Electronic Resource
Japanese
WATER SUPPLY MANAGEMENT SYSTEM, SERVER, CONTROL DEVICE, WATER SUPPLY MANAGEMENT METHOD, AND PROGRAM
European Patent Office | 2023
|WATER SUPPLY MANAGEMENT SYSTEM, WATER SUPPLY MANAGEMENT METHOD AND PROGRAM
European Patent Office | 2024
|UNLOCKING MANAGEMENT SYSTEM, UNLOCKING MANAGEMENT SERVER, UNLOCKING MANAGEMENT METHOD, AND PROGRAM
European Patent Office | 2023
|MANAGEMENT METHOD, MANAGEMENT SERVER, COMPUTER PROGRAM, AND OPERATION METHOD FOR MANAGEMENT SYSTEM
European Patent Office | 2021
|