A platform for research: civil engineering, architecture and urbanism
SOUND ABSORPTION PANEL UNIT, SOUND INSULATION PANEL UNIT, SOUND ABSORPTION PANEL, AND SOUND INSULATION PANEL
PROBLEM TO BE SOLVED: To solve the problem that although a window hole for confirming the insertion state of a wire rope is formed on the side wall of a conventional sound absorption panel, the window hole is hidden by an H-shaped support post after construction, thereby making it difficult to confirm the insertion state of the wire rope after construction.SOLUTION: A fixture 14 to be placed between a front plate 18 of a sound absorption panel 12 and a front side flange 58A of an H-shaped support post 56 opposite to this forms a gap between the front plate 18 of the sound absorption panel 12 and the front side flange 58A. A window hole 40 penetrating to a wire rope insertion path 36 is formed in a side region 30 of the front plate 18 of the sound absorption panel 12 so that the wire rope insertion path 36 can be made visible via the window hole 40 from the gap formed by the fixture 14.
【課題】従来の吸音パネルの側壁には、ワイヤロープの挿通状態を確認するための窓孔が設けられているが、施工後に窓孔がH形支柱に隠れてしまうため、ワイヤロープの挿通状態を施工後に確認することが困難となる。【解決手段】吸音パネル12の前面板18とこれに対向するH形支柱56の前面側フランジ58Aとの間に打ち込まれる固定金具14が、吸音パネル12の前面板18と前面側フランジ58Aとの間に間隙を形成する。吸音パネル12の前面板18の側部領域30には、ワイヤロープ挿通経路36まで貫通された窓孔40が形成されており、固定金具14により形成された間隙から、窓孔40を介してワイヤロープ挿通経路36を目視可能となっている。【選択図】図5
SOUND ABSORPTION PANEL UNIT, SOUND INSULATION PANEL UNIT, SOUND ABSORPTION PANEL, AND SOUND INSULATION PANEL
PROBLEM TO BE SOLVED: To solve the problem that although a window hole for confirming the insertion state of a wire rope is formed on the side wall of a conventional sound absorption panel, the window hole is hidden by an H-shaped support post after construction, thereby making it difficult to confirm the insertion state of the wire rope after construction.SOLUTION: A fixture 14 to be placed between a front plate 18 of a sound absorption panel 12 and a front side flange 58A of an H-shaped support post 56 opposite to this forms a gap between the front plate 18 of the sound absorption panel 12 and the front side flange 58A. A window hole 40 penetrating to a wire rope insertion path 36 is formed in a side region 30 of the front plate 18 of the sound absorption panel 12 so that the wire rope insertion path 36 can be made visible via the window hole 40 from the gap formed by the fixture 14.
【課題】従来の吸音パネルの側壁には、ワイヤロープの挿通状態を確認するための窓孔が設けられているが、施工後に窓孔がH形支柱に隠れてしまうため、ワイヤロープの挿通状態を施工後に確認することが困難となる。【解決手段】吸音パネル12の前面板18とこれに対向するH形支柱56の前面側フランジ58Aとの間に打ち込まれる固定金具14が、吸音パネル12の前面板18と前面側フランジ58Aとの間に間隙を形成する。吸音パネル12の前面板18の側部領域30には、ワイヤロープ挿通経路36まで貫通された窓孔40が形成されており、固定金具14により形成された間隙から、窓孔40を介してワイヤロープ挿通経路36を目視可能となっている。【選択図】図5
SOUND ABSORPTION PANEL UNIT, SOUND INSULATION PANEL UNIT, SOUND ABSORPTION PANEL, AND SOUND INSULATION PANEL
吸音パネルユニット、遮音パネルユニット、吸音パネル、及び遮音パネル
MATAGI AYUMU (author) / MATSUDA SHUICHI (author) / ITO YOSHIO (author)
2015-06-18
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2019
|