FLOTATION REPAIR METHOD OF TILE LAYING OUTER WALL
PROBLEM TO BE SOLVED: To provide a flotation repair method of a tile laying outer wall capable of preventing an indoor environment of a building from being impaired by a scaffold, besides becoming advantageous in terms of a process, by preventing reduction in an outward appearance by noncoincidence of a color tone and a feeling of a repair part and the other part, when a cavity between a concrete skeleton and a mortar layer becomes large flotation (pregnancy).SOLUTION: A flotation repair method includes a process of pushing back the flotation (the pregnancy) of a tile layer of a repair object range 22 by installed a bolt 28 in respective boring parts by boring a hole at a predetermined interval in joints 26 and 30 in the repair object range 22 of a tile outer wall 18 of causing the floatation (the pregnancy) over a predetermined range, a process of precedently injecting an adhesive 34 into the respective boring parts by boring the hole at a predetermined interval in the joints 26 and 30 between the bolts 28 and a process of regularly injecting the adhesive into the boring part of removing the bolt 28 by removing the bolt 28 after the precedently injected adhesive 34 is hardened.
【課題】コンクリート躯体とモルタル層との間の空隙が大きな浮き(ハラミ)となっている場合に、補修部分と他の部分との色調や風合いの不一致による見栄えの低下を防止し、工程面で有利となる上に、当該建物の室内環境を足場によって損なうのを防止できるタイル張り外壁の浮き補修方法を提供する。【解決手段】所定の範囲にわたり浮き(ハラミ)が生じたタイル外壁18の補修対象範囲22内の目地26、30に所定間隔で穿孔し、各穿孔部にボルト28を取り付けて補修対象範囲22のタイル層の浮き(ハラミ)を押し戻す工程と、ボルト28間の目地26、30に所定間隔で穿孔を行い、各穿孔部内に接着剤34を先行注入する工程と、先行注入した接着剤34が硬化した後、ボルト28を撤去し、ボルト28を撤去した穿孔部に接着剤を本注入する工程とを含む。【選択図】図1
FLOTATION REPAIR METHOD OF TILE LAYING OUTER WALL
PROBLEM TO BE SOLVED: To provide a flotation repair method of a tile laying outer wall capable of preventing an indoor environment of a building from being impaired by a scaffold, besides becoming advantageous in terms of a process, by preventing reduction in an outward appearance by noncoincidence of a color tone and a feeling of a repair part and the other part, when a cavity between a concrete skeleton and a mortar layer becomes large flotation (pregnancy).SOLUTION: A flotation repair method includes a process of pushing back the flotation (the pregnancy) of a tile layer of a repair object range 22 by installed a bolt 28 in respective boring parts by boring a hole at a predetermined interval in joints 26 and 30 in the repair object range 22 of a tile outer wall 18 of causing the floatation (the pregnancy) over a predetermined range, a process of precedently injecting an adhesive 34 into the respective boring parts by boring the hole at a predetermined interval in the joints 26 and 30 between the bolts 28 and a process of regularly injecting the adhesive into the boring part of removing the bolt 28 by removing the bolt 28 after the precedently injected adhesive 34 is hardened.
【課題】コンクリート躯体とモルタル層との間の空隙が大きな浮き(ハラミ)となっている場合に、補修部分と他の部分との色調や風合いの不一致による見栄えの低下を防止し、工程面で有利となる上に、当該建物の室内環境を足場によって損なうのを防止できるタイル張り外壁の浮き補修方法を提供する。【解決手段】所定の範囲にわたり浮き(ハラミ)が生じたタイル外壁18の補修対象範囲22内の目地26、30に所定間隔で穿孔し、各穿孔部にボルト28を取り付けて補修対象範囲22のタイル層の浮き(ハラミ)を押し戻す工程と、ボルト28間の目地26、30に所定間隔で穿孔を行い、各穿孔部内に接着剤34を先行注入する工程と、先行注入した接着剤34が硬化した後、ボルト28を撤去し、ボルト28を撤去した穿孔部に接着剤を本注入する工程とを含む。【選択図】図1
FLOTATION REPAIR METHOD OF TILE LAYING OUTER WALL
タイル張り外壁の浮き補修方法
SHIRAO NAOMI (author) / SUZUKI WATARU (author) / NAITO HIDEO (author) / KANO MASASHIGE (author) / HATAKEYAMA RYUNOSUKE (author) / KATSUNO TETSUHIRO (author) / NOGAMI JOJI (author)
2015-08-03
Patent
Electronic Resource
Japanese
Outer wall ceramic tile laying device for single-storey building
European Patent Office | 2020
|WATERPROOF STRUCTURE OF OUTER WALL TILE, AND WATERPROOF CONSTRUCTION METHOD OF OUTER WALL TILE
European Patent Office | 2023
|