A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR LEANING EARTH RETAINING WALL
PROBLEM TO BE SOLVED: To provide a construction method for a leaning earth retaining wall that eliminates the need to erect a back form and therefore curtails a construction period and enhances construction safety.SOLUTION: A construction method comprises: a first step in which unit bodies 20 comprising lattice-form reinforcements 10, which have a plurality of bent vertical reinforcements 1 and a plurality of horizontal reinforcements 2 that links the plurality of vertical reinforcements 1, and a suction-proof material 4 fixed to the lattice-form reinforcements 10 are prepared and the unit bodies 20 are installed in front of a slope of cut earth or an embankment; a second step in which a backfill material 30 is spread and compacted in the space between the unit bodies 20 and the slope; and a third step in which a surface form 41 is installed in front of the unit bodies 20 and concrete is filled in the space between the surface form 41 and the unit bodies 20 used as a back form and hardened for constructing a leaning earth retaining wall 50.
【課題】もたれ擁壁の施工に際し、裏型枠の施工を不要とし、もって工期の短縮と施工安全性の向上を図ることのできるもたれ擁壁の施工方法を提供する。【解決手段】複数の屈曲した縦筋1と、複数の縦筋1を繋ぐ複数の横筋2と、から構成される格子状鉄筋10と、格子状鉄筋10に固定された吸出し防止材4と、からなるユニット体20を用意し、切土もしくは盛土の法面の前方位置にユニット体20を設置する第1のステップ、ユニット体20と法面の間の空間に裏込め材30を敷き固める第2のステップ、ユニット体20の前方位置に表型枠41を設置し、ユニット体20を裏型枠として、表型枠41と裏型枠の間の空間にコンクリートを充填し、硬化させてもたれ擁壁50を施工する第3のステップからなる施工方法である。【選択図】図4
CONSTRUCTION METHOD FOR LEANING EARTH RETAINING WALL
PROBLEM TO BE SOLVED: To provide a construction method for a leaning earth retaining wall that eliminates the need to erect a back form and therefore curtails a construction period and enhances construction safety.SOLUTION: A construction method comprises: a first step in which unit bodies 20 comprising lattice-form reinforcements 10, which have a plurality of bent vertical reinforcements 1 and a plurality of horizontal reinforcements 2 that links the plurality of vertical reinforcements 1, and a suction-proof material 4 fixed to the lattice-form reinforcements 10 are prepared and the unit bodies 20 are installed in front of a slope of cut earth or an embankment; a second step in which a backfill material 30 is spread and compacted in the space between the unit bodies 20 and the slope; and a third step in which a surface form 41 is installed in front of the unit bodies 20 and concrete is filled in the space between the surface form 41 and the unit bodies 20 used as a back form and hardened for constructing a leaning earth retaining wall 50.
【課題】もたれ擁壁の施工に際し、裏型枠の施工を不要とし、もって工期の短縮と施工安全性の向上を図ることのできるもたれ擁壁の施工方法を提供する。【解決手段】複数の屈曲した縦筋1と、複数の縦筋1を繋ぐ複数の横筋2と、から構成される格子状鉄筋10と、格子状鉄筋10に固定された吸出し防止材4と、からなるユニット体20を用意し、切土もしくは盛土の法面の前方位置にユニット体20を設置する第1のステップ、ユニット体20と法面の間の空間に裏込め材30を敷き固める第2のステップ、ユニット体20の前方位置に表型枠41を設置し、ユニット体20を裏型枠として、表型枠41と裏型枠の間の空間にコンクリートを充填し、硬化させてもたれ擁壁50を施工する第3のステップからなる施工方法である。【選択図】図4
CONSTRUCTION METHOD FOR LEANING EARTH RETAINING WALL
もたれ擁壁の施工方法
MATSUOKA MOTONOBU (author)
2015-08-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
EARTH RETAINING WALL, CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2019
|Earth retaining wall construction device and earth retaining wall construction method
European Patent Office | 2021
|EARTH RETAINING WALL, AND CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2022
|EARTH RETAINING WALL AND CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2015
|EARTH RETAINING WALL AND CONSTRUCTION METHOD FOR THE EARTH RETAINING WALL
European Patent Office | 2015
|