A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF EARTHQUAKE-PROOF REINFORCEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of an earthquake-proof reinforcement structure capable of improving working efficiency.SOLUTION: A unit 50 is formed by placing a form 53 and a reinforcement 54a for constructing a new slab 31 on a lifting bracket 51, by providing the lifting bracket 51 under a precast beam 52 of integrating a part 52a to be a joining part of a new beam 21 and a new column 22 and a part 52b to be the new beam 21 on the ground. The unit 50 is installed so that a tip part of a lifting bracket 51 is supported by a tip support member 42 installed on an existing beam 12, by installing the part 52a of the precast beam 52 on the new column 22, by lifting the unit 50.
【課題】作業効率の向上を図ることが可能な耐震補強構造体の構築方法を提供する。【解決手段】 地上にて、新設梁21と新設柱22との接合部となる部分52aと新設梁21となる部分52bとが一体になったプレキャスト梁52の下に揚重ブラケット51を設けと、当該揚重ブラケット51上に新設スラブ31を構築するための型枠53及び鉄筋54をs載置してユニット50を形成する。ユニット50を揚重して、プレキャスト梁52の部分52aを新設柱22の上に設置し、且つ、揚重ブラケット51の先端部が、既存梁12に設置された先端支持部材42で支持されるように、ユニット50を設置する。【選択図】図3
CONSTRUCTION METHOD OF EARTHQUAKE-PROOF REINFORCEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of an earthquake-proof reinforcement structure capable of improving working efficiency.SOLUTION: A unit 50 is formed by placing a form 53 and a reinforcement 54a for constructing a new slab 31 on a lifting bracket 51, by providing the lifting bracket 51 under a precast beam 52 of integrating a part 52a to be a joining part of a new beam 21 and a new column 22 and a part 52b to be the new beam 21 on the ground. The unit 50 is installed so that a tip part of a lifting bracket 51 is supported by a tip support member 42 installed on an existing beam 12, by installing the part 52a of the precast beam 52 on the new column 22, by lifting the unit 50.
【課題】作業効率の向上を図ることが可能な耐震補強構造体の構築方法を提供する。【解決手段】 地上にて、新設梁21と新設柱22との接合部となる部分52aと新設梁21となる部分52bとが一体になったプレキャスト梁52の下に揚重ブラケット51を設けと、当該揚重ブラケット51上に新設スラブ31を構築するための型枠53及び鉄筋54をs載置してユニット50を形成する。ユニット50を揚重して、プレキャスト梁52の部分52aを新設柱22の上に設置し、且つ、揚重ブラケット51の先端部が、既存梁12に設置された先端支持部材42で支持されるように、ユニット50を設置する。【選択図】図3
CONSTRUCTION METHOD OF EARTHQUAKE-PROOF REINFORCEMENT STRUCTURE
耐震補強構造体の構築方法
KISHIMOTO TAKESHI (author) / KONO MASANORI (author) / KOTAKE TAKAO (author) / HAMASAKI KENICHI (author)
2015-11-09
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|EARTHQUAKE-PROOF REINFORCEMENT APPARATUS OF SUPERANNUATION CONSTRUCTION STRUCTURE
European Patent Office | 2019
|