A platform for research: civil engineering, architecture and urbanism
BOLT HOLDER OF CONNECTION BOLT OF STEEL PIPE PILE AND CONNECTING METHOD OF STEEL PIPE PILE
PROBLEM TO BE SOLVED: To provide a bolt holder mounted in a joint pipe in a steel pipe pile for use in connection of the steel pipe pile, the bolt holder that facilitates mounting of the bolt, the alignment between the tip of a bolt shaft section and a bolt hole of the joint pipe, and the work of drawing a tip portion of the bolt shaft section to the outside of the steel pipe pile.SOLUTION: A bolt holder 24 is mounted to a joint pipe 23 disposed inside of steel pipe piles 21, 22. A head 251 of a bolt 25 is held to a bolt head holding member 243, and a tip portion of a bolt shaft section 252 is inserted and held to the bolt hole 231 of the joint pipe 23. A male screw part 253 of the bolt 25 is drawn to the outside of the steel pipe pile 22 by using a bolt extractor, and a nut 26 is screwed and bolted to the male screw part 253.
【課題】鋼管杭の連結に用いる鋼管杭内の継手管に取り付けるボルト保持具において、ボルトの取り付け、ボルト軸部の先端と継手管のボルト孔との位置合せ、及びボルト軸部の先端部分を鋼管杭の外へ引き出 す作業が容易なボルト保持具を提供すること。【解決手段】鋼管杭21,22の内側に配置した継手管23にボルト保持具24を取り付けてある。ボルト25の頭部251は、ボルト頭部保持部材243に保持され、ボルト軸部252の先端部分は、継手管23のボルト孔231に挿入・保持される。ボルト25の雄ねじ部253は、ボルト引出具を用いて鋼管杭22の外へ引き出し、雄ねじ部253にナット26を羅合してボルト締めする。【選択図】図2
BOLT HOLDER OF CONNECTION BOLT OF STEEL PIPE PILE AND CONNECTING METHOD OF STEEL PIPE PILE
PROBLEM TO BE SOLVED: To provide a bolt holder mounted in a joint pipe in a steel pipe pile for use in connection of the steel pipe pile, the bolt holder that facilitates mounting of the bolt, the alignment between the tip of a bolt shaft section and a bolt hole of the joint pipe, and the work of drawing a tip portion of the bolt shaft section to the outside of the steel pipe pile.SOLUTION: A bolt holder 24 is mounted to a joint pipe 23 disposed inside of steel pipe piles 21, 22. A head 251 of a bolt 25 is held to a bolt head holding member 243, and a tip portion of a bolt shaft section 252 is inserted and held to the bolt hole 231 of the joint pipe 23. A male screw part 253 of the bolt 25 is drawn to the outside of the steel pipe pile 22 by using a bolt extractor, and a nut 26 is screwed and bolted to the male screw part 253.
【課題】鋼管杭の連結に用いる鋼管杭内の継手管に取り付けるボルト保持具において、ボルトの取り付け、ボルト軸部の先端と継手管のボルト孔との位置合せ、及びボルト軸部の先端部分を鋼管杭の外へ引き出 す作業が容易なボルト保持具を提供すること。【解決手段】鋼管杭21,22の内側に配置した継手管23にボルト保持具24を取り付けてある。ボルト25の頭部251は、ボルト頭部保持部材243に保持され、ボルト軸部252の先端部分は、継手管23のボルト孔231に挿入・保持される。ボルト25の雄ねじ部253は、ボルト引出具を用いて鋼管杭22の外へ引き出し、雄ねじ部253にナット26を羅合してボルト締めする。【選択図】図2
BOLT HOLDER OF CONNECTION BOLT OF STEEL PIPE PILE AND CONNECTING METHOD OF STEEL PIPE PILE
鋼管杭の連結用ボルトのボルト保持具と鋼管杭の連結方法
OGAWA HIROSHI (author)
2015-11-26
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE CONNECTION APPATUS AND METHOD OF CONNECTING STEEL PIPE PILE
European Patent Office | 2023
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE CONNECTION METHOD
European Patent Office | 2022
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE BASE, AND CONNECTION METHOD OF STEEL PIPE PILE
European Patent Office | 2023
|STEEL PIPE PILE COUPLER WITH BOLT TIGHTENING U-SHAPE REINFORCING BAR
European Patent Office | 2015
|Bolt connection type steel pipe pile trestle based on four-point positioning and construction method
European Patent Office | 2021
|